Dür Oңğar village of Karmakshy district connected to natural gas
25.11.2025 17:21:04 84
Today, with the participation of the Akim of the region, Nurlibek Nәlibaev, a ceremony was held to connect the village of Dür Oңğar in the Karmakshy district to natural gas. Deputies of the Senate and the Mazhilis of the Parliament — Ruslan Rüstemov, Murat Abenov, Murat Ergeshbayev — as well as respected elders and local residents attended the event.
The regional governor congratulated the residents on the long-awaited development — the arrival of natural gas in the village.
“The Head of State emphasized: The Government must significantly increase the number of gasified settlements and modernize 1,700 kilometers of gas pipelines. This will allow more than 300 thousand people to be supplied with natural gas,” he noted.
At the end of 2021, the level of gasification in our region was 67%. Between 2022 and 2025, 77 projects worth 63.6 billion tenge were implemented. Last week, natural gas was supplied to the village of Shagan in the Syrdarya district, and an automated gas distribution station was launched in the Zhanakorgan district. Today, together with you, we are witnessing an event that will give a new impulse to the daily life and well-being of Dür Oңğar residents — the connection to natural gas. As a result of these works, the gasification level of the region will reach 83% this year.
I congratulate all residents on the connection to natural gas! This is our common joy! May the ‘blue fuel’ bring warmth to every home and strengthen our homeland!
The development of the country begins with the village and its prosperity. The future of the village depends on your hard work and unity. I wish you all strong health, prosperity in your families, and success in your service for the benefit of the region!” said Nurlibek Mashbekuly.
At the ceremony, veterans who contributed to the socio-economic development of the district, as well as employees of the contracting company, were awarded Letters of Gratitude from the regional akim. Senator Ruslan Rüstemuly also delivered a congratulatory speech.
It should be noted that today the level of gasification in the Karmakshy district is 78%. The connection of Dür Oңğar village — home to over two thousand residents — will raise this figure to 83%. The project was funded with 7.2 billion tenge from the regional budget.
A 62.5 km high-pressure gas pipeline was laid from the automated gas distribution station in Zhosaly through the Syrdarya River. In the future, this project will allow more than 10 thousand people in 9 settlements to be gradually connected to the main gas pipeline.

Source : https://www.gov.kz/memleket/entities/kyzylorda-karmakshy/press/news/details/1112254?lang=kk