The village Aktan Batyr was connected to natural gas
29.03.2025 19:03:05 330
In the Kazaly district, during the celebration of Nauryz, the village of Aktan Batyr was connected to natural gas with the participation of the regional head, Nurlybek Nalibayev. The ceremonial event was attended by deputies of the Senate and Majilis of the Parliament of the Republic of Kazakhstan, including Ruslan Rustemov, Murat Abenov, Markhabat Zhaiymbetov, and Murat Ergeshbaev, as well as representatives of the intelligentsia and local residents.
The akim of the region congratulated the residents on the Nauryz holiday and this joyful occasion. At the event, citizens who contributed to the socio-economic development of the district received letters of gratitude from the akim.
By 2025, all settlements in the region will have 100% access to centralized drinking water. Currently, 38 projects worth KZT 11 billion are underway to provide electricity to the population. In 2024, over 300 km of roads were repaired, increasing the share of roads in good condition to 92%. In 2025, an additional 329 km of roads will be repaired, raising the share of roads in good condition to 95%. The reconstruction of the national highway "Kyzylorda-Zhezkazgan" is ongoing, with 151 out of 216 kilometers completed and operational. An additional 30 km of two-layer asphalt pavement has been laid, and the project is expected to be fully completed in 2025. A new terminal at Korkyt Ata airport has been opened, and with the support of Kazakhstan Temir Zholy and local entrepreneurs, a major overhaul of the railway station has been completed. A new bus station has also been put into operation in Kyzylorda.

Source : https://www.gov.kz/memleket/entities/kyzylorda/press/news/details/962413?lang=kk