A new bridge
10.04.2025 16:49:08 1873The length of the motor bridge is 87 meters and width – 4 meters. The bridge can withstand load up to 60 tons. It was constructed during four months for the money, invested by three companies – “KazAutoZhol” JSC, “Pavlodar river port” JSC and “Stalmontazh” LP. Representatives of the last firm assured that the bridge had been built properly.

“We can guarantee a part of the bridge we have built, namely 28 piles and bridge superstructures with fences. The guarantee is 50 years,” Vyacheslav Vdovydchenko, executive director of “Stalmontazh” LP said.

The head of the region checked the quality of the bridge. Bulat Bakauov took a favourable view of the work of the bridge builders.

Thanks to the new bridge, Pavlodar residents and guests of the city will be able to go to the left bank of the Usolka River. In the near future biathlon and triathlon tracks will be built here.
Source : https://www.gov.kz/memleket/entities/pavlodar/press/news/details/9948?lang=kk