Work on construction sites under control
18.04.2025 02:02:20 396
Today, following the directives of regional leader Nurlybek Nalibayev, the chairman of the regional maslikhat, along with the deputy akims and the head of the akim's office, toured the construction sites in Kyzylorda to observe the ongoing development.
Last year, a 1,000-seat arts center was inaugurated, which now serves as the venue for the regional philharmonic, hosting a variety of large-scale concerts featuring pop, symphonic, and traditional music, as well as diverse events. The new terminal at Korkyt Ata airport was financed by an investor, with the Bulat Utemuratov Foundation contributing KZT 16.6 billion and the regional budget providing over KZT 4.3 billion to enhance the necessary infrastructure for the facility.
Currently, the reconstruction of bridges over the Zhanadariya, Syzdyk, and Shirkeyli canals is underway. The contractor BSJ Engineering LLC is working on the bridge over the Zhanadariya canal. This crossing is important for city residents, as it provides access to the AutoTsON, the airport, and connects the nearby villages of Amangeldy, Besaryk, Irkol, Kogalykol, Zhetikol, and Aydarly with the regional center. Repairs to the bridges over the Syzdyk and Shirkeyli canals are being carried out by Zhylu 21 LLC. Work is also ongoing to expand a 13.5-kilometer section of the highway into a four-lane road.
The working group also visited the construction sites of a pasta and confectionery complex, a stadium for 11,000 people, a physics and mathematics boarding school, and a new building for the music college. The confectionery and pasta complex is being built by Kyzylorda Nan LLP. The facility covers more than six thousand square meters and costs KZT 3.8 billion. The workshops will produce up to 2,520 tons of confectionery per year, as well as more than 15 types of pasta.
Currently, the installation of metal structures on the eastern and western stands of the future stadium has been completed, interior decoration is underway, and external stained-glass windows are being erected. Overall, work has been completed on the construction of external walls, the installation of internal utilities, and the installation of a football field. Landscaping of the area will begin soon. Representatives of the working group also reviewed the progress of construction for the physics and mathematics school and the music college.

Source : https://www.gov.kz/memleket/entities/kyzylorda/press/news/details/976073?lang=kk