Aktau's heating networks have been updated for the first time in 50 years
24.12.2024 21:35:02 594
In 2024-2026, it is planned to modernize 44 kilometers of the main heat pipeline to provide Aktau residents with high-quality utilities. This year, 11.5 cubic meters of worn-out heating lines were completely replaced according to the 1st stage of the project. 12 billion tenge has been allocated from the national budget for these purposes. This was announced by Akim of the region Nurdaulet Kilybai at a press conference in the CCS.
Also last year, a set of urgent measures was taken to ensure uninterrupted supply of thermal energy to residential buildings. A 9-block modular heat boiler with a capacity of 65 MW has been installed at the expense of the local budget. In addition, 479 automated heating control units have been installed in residential buildings in Aktau, which makes it possible to efficiently use thermal energy.
Today, the heat supply through the heating network of the city is carried out in a regular mode. The provision of thermal energy to residential buildings and social facilities is strictly controlled by the region's leadership. The Akimat of the region is implementing appropriate measures to upgrade Aktau's heating networks.
Press service of Akim of Mangystau region

Source : https://www.gov.kz/memleket/entities/mangystau/press/news/details/906442