Development of the medical infrastructure of the region
15.07.2025 09:10:37 209
Medical infrastructure
Medical and preventive care is provided to the population of the region by 27 inpatient institutions (16 district hospitals, 9 city hospitals, 2 rural hospitals), the Regional Center for Phthisiopulmonology, the Center for Mental Health, the Emergency medical Station, the Center for the Prevention and Control of AIDS, the Blood Center, 6 polyclinics, 40 outpatient clinics, 73 paramedic and obstetric centers, 286 medical centers, 1 department of primary obstetric and gynecological care, 1 base of special medical supplies, 2 medical colleges, 2 orphanages, 1 rehabilitation center.
New facilities and modernization
In 2023-2024, as part of the implementation of the National Project "Modernization of Rural Healthcare", the construction of 25 primary health care facilities has been completed - 5 outpatient clinics, 19 paramedic and obstetric centers, and 1 medical center.
Among them, an outpatient clinic in the village of Moskovskoye, Kostanay district, equipped with an ultrasound room, a rehabilitation room, diagnostic equipment (SMAD, holter, ECG, etc.)
, now most medical services are available directly on site, without the need to travel to the district center.
In 2024, at the expense of private investments by ECO CITY KZ LLP, a polyclinic for 250 visits per shift was built in the city of Tobyl to ensure the immediate availability of high-quality medical care using modern methods.
In 2025, polyclinic No. 6, built with private investment funds, will be commissioned in Kostanay.
Major repairs of healthcare facilities
From 2022 to 2025, capital repairs covered 20 healthcare facilities for a total amount of 5.7 billion tenge.
As part of the Auyl - El Besigi program, the building of the paramedic and obstetric center in Elizavetinka village, Beimbeta Mailina district, underwent major repairs, the repair cost is 52.6 million tenge. Design and estimate documentation has been developed for the overhaul of 12 healthcare facilities for a total amount of 18.8 million tenge.
In 2023, the building of the department of the Kostanay Regional Mental Health Center in Arkalyk was completely renovated in the amount of 426.5 million tenge, the buildings of the Fedorovskaya District Hospital in the amount of 328.7 million tenge, the FAP in the village of Karasu in Amangeldy district in the amount of 38.5 million tenge, the 3-storey building of the Rudnenskaya City Multidisciplinary Hospital" in the amount of 520.5 million tenge.
In 2024, as part of the Auyl - El Besigi program, the FAP building in the village of Krasnaya Presnya, Mendykara district, was overhauled in the amount of 36.7 million tenge, the Stepanovsky FAP building in Mendykara district in the amount of 35.7 million tenge, and the FAP building in Novotroitsk, Karabalyk district, in the amount of 40.9 million tenge.
In 2025, the building of the therapeutic building of 3-5 floors of the Kostanay Regional Center of Phthisiopulmonology is undergoing major repairs in the amount of 294.7 million tenge. As part of the "Auyl - El Besigi" program, the building of the FAP in Zabelovka village, Zhitikarinsky district, is undergoing major repairs in the amount of 93.4 million tenge.
Since 2024, major repairs of the maternity hospital building No. 1 of the Kostanay Regional Hospital in the amount of 1,033.5 million tenge, the building of the Sarykol District Hospital in the amount of 1,705.2 million tenge have been ongoing.
In December 2022, a stroke center in the village of Auliekol was commissioned in the territory of the Auliekol district, which was damaged by fire, at the expense of sponsorship funds (Bulat Utemuratov Charitable Foundation, investment volume of more than 1.1 billion tenge), and a paramedic and obstetric center was also built in the village of Amankaragai (NAK Development LLP, investment volume, more than 125.0 million tenge).
At the expense of sponsorship funds, a paramedic and obstetric center was also built in Novopokrovka village of Uzunkol district, with a total cost of 40.0 million tenge.
At the same time, these medical facilities were transferred to the balance of the State Institution "Health Department of the Akimat of Kostanay region".
In addition, as part of the implementation of the National Project "Modernization of Rural Healthcare", a 3-year project for the overhaul of the maternity hospital building of the Arkalyk Regional Hospital is continuing from 2023.
The total cost is 1.2 billion tenge (2023 – 442.8 million tenge, 2024 – 279.8 million tenge, 2025 – 469.0 million tenge).
Ongoing repairs of healthcare facilities
From 2022 to 2024, 87 facilities totaling 2.1 billion tenge were covered by ongoing repairs.
In 2025, it is planned to carry out ongoing repairs at 21 facilities in the amount of 883.2 million tenge.
Systematic work on updating and expanding the medical infrastructure makes healthcare in the region more accessible, modern and focused on the needs of people, both in the city and in the most remote villages.

Source : https://www.gov.kz/memleket/entities/kostanay/press/news/details/1034405?lang=kk