Karasu district: there is no threat of flooding

Karasu district: there is no threat of flooding

01.04.2026 19:27:04 274

Kumar Aksakalov, the Akim of the Kostanay Region, paid a working visit to the villages of Karamyrza and Oktyabrskoye in the Karasu district, where he reviewed flood control measures. The district has prepared 20 thousand bags, 450 thousand units of inert materials, and mobilized over 110 personnel and 20 pieces of equipment.

As of now, no incidents of residential house flooding have been registered in the village of Karamyrza. In the spring of 2025, work was carried out to embank 56 flood-prone yards in Karamyrza. To date, additional embankment work has been completed for the village. 1000 units of bag containers have been laid.

Additionally, clearance of drainage channels into the Tyuntyugur River is being conducted.

The first and second stage hydraulic structures on the river ensure the safe passage of floodwaters on the Tyuntyugur River.

The first stage was commissioned in 1956, the second – in 1972. Over decades of service, the structures have undergone significant wear.

To ensure the safe passage of floodwaters and prevent flooding, repairs to the hydraulic structures were carried out in 2025.

The repair work was completed in December 2025. This has not only restored the facilities but also extended their service life and protected adjacent areas from the threat of flooding.

Currently, 8 units of heavy machinery and 10 personnel are deployed on duty at the hydraulic structures.

Source : https://www.gov.kz/memleket/entities/kostanay/press/news/details/1192123?lang=kk