Enbekshi QazaQ

Law

Residents of the village of Aidarly, Zerendinsky district, have access to clean water. 24.12.2024
The construction of a water pipeline has finally been completed in the village of Aidarly, Zerendinsky district, providing 76 households with access to high-quality drinking water.The project has become a long-awaited event for local residents who have been experiencing difficulties with water supply for a long time. Now, out of 320 villagers, many can use clean water in their homes.The launch of the water pipeline was carried out within the framework of the instruction of the President of the Republic of Kazakhstan on the program of providing villages with high-quality drinking water. This initiative covers many regions of the country, providing access to water resources even in the most remote settlements. The village of Aidarly was also included in the list of objects of the program.To provide residents with clean water, a water treatment system using CBN technology has been installed in the village. This guarantees high-quality water that meets all sanitary requirements.The total length of the water supply system in the village was 7812 meters, including 2181 meters of main water supply and 4006 meters of distribution networks. Backup wells became the source of water. Two pumping stations and a 50 m3 water tower were also built as part of the project.Local residents note a significant improvement in living conditions. Now they have the opportunity to use clean water in their homes, which has become an important step towards improving their comfort level.Deputy akim of Zerendinsky district Serik Isakhanov conducted a check of water quality and conditions in houses. He assured that the water in Aydarly meets all standards and that solving this problem is of great importance for improving the lives of rural residents.The water supply program will continue next year. As part of the initiative, it is planned to build water pipes and provide drinking water in other villages of the district.Source : https://www.gov.kz/memleket/entities/aqmola/press/news/details/905551
The keys to new houses were given to large families in the Akkol district 24.12.2024
18 large families from Akkol district received keys to new houses. This has become a symbol of the effective implementation of the state policy on providing affordable housing to socially vulnerable categories of the population.The solemn ceremony of handing over the keys was held with the participation of akim of the district Birzhan Abdrakhmanov. In his speech, he noted the importance of creating comfortable living conditions for large families."Today we are taking an important step in improving the lives of our citizens. Fulfilling the instructions of the Head of State, we continue to work on creating comfortable conditions for large families. Today is a significant event – the handing over of the keys to new houses, which will become a reliable and comfortable haven for large families," the head of the district emphasized.Handing over the keys became possible thanks to the state program of support for socially vulnerable segments of the population. Special attention was paid not only to the quality of the living quarters, but also to the creation of a convenient infrastructure around the houses. These measures are aimed at providing large families not only with a roof over their heads, but also a comfortable environment for living and raising children.An important part of the program was the introduction of a new housing purchase mechanism. It allows us to provide high-quality and affordable housing to those who need it the most.The large families who received the keys expressed their gratitude for the opportunity to improve their living conditions. For many of them, this event marked the beginning of a new stage in their lives."This is a great joy for us. Now our children will have more space to study and play, and we, as parents, can be confident in their future. Thank you for such help and care," one of the happy moms shared.By the way, it is planned to continue work in the field of housing construction, paying special attention to large families and other socially vulnerable categories of the population.Source : https://www.gov.kz/memleket/entities/aqmola/press/news/details/905700
The production of specialized dietary nutrition has opened in the Shortandinsky district 24.12.2024
A plant of HealthInvest LLP, specializing in the production of innovative dietary products under the Hormesis brand, has opened in the village of Bozaigyr in the Shortand district. The project was implemented with the involvement of grant financing from the Science Foundation JSC and its own investments.The launch of the plant marked a new stage in the development of domestic production of healthy food products. The production capacity of the enterprise is 1.2 million packages per year, which will fully meet the needs of the domestic market of Kazakhstan.The company's production site covers more than 500 square meters, where modern production facilities, a laboratory and utility rooms are located. To ensure high-quality products, the plant is equipped with innovative equipment that meets international standards.According to the head of the company, Nursultan Kalamov, Hormesis products have passed all the necessary examinations and laboratory tests at the Kazakh Academy of Nutrition, having received certificates of conformity."The Hormesis gel is not just an energy source. It has a complex effect on the body, supporting health and activity. We are proud that we can offer consumers a high-quality and useful product created in Kazakhstan," said Nursultan Kalamov.The launch of production provided jobs for five people with an average salary of 370 thousand tenge. The project also contributes to the development of the region's infrastructure and strengthening the economic potential of the Akmola region.The management of HealthInvest LLP expressed gratitude to the Science Foundation JSC, the Ministry of Science and Education of Kazakhstan, as well as local executive bodies for supporting the project."We are very pleased to contribute to the development of our region. We thank everyone who helped us on the way to opening this production facility," the head of the company emphasized. Source : https://www.gov.kz/memleket/entities/aqmola/press/news/details/905721
Results of the year: the main achievements and directions of future development of the country in the field of energy 24.12.2024
NoneSource : https://www.gov.kz/memleket/entities/aqmola/press/news/details/905802
The National Commission on Women's Affairs and Family and Demographic Policy under the President of the Republic of Kazakhstan summed up the results of the year 24.12.2024
The National Commission on Women's Affairs and Family and Demographic Policy under the President of the Republic of Kazakhstan summed up the work for the current period and defined tasks for 2025.The meeting was attended by the Chairman of the National Commission, Minister of Culture and Information of the Republic of Kazakhstan Aida Balayeva, members of the National Commission, representatives of the expert community, deputy akims of the regions, heads of central government agencies.Aida Balayeva noted that in the past year, the National Commission had worked out a wide range of topical issues of protecting the rights of women and children, promoting family values and the idea of responsible parenthood. At the same time, the Chairman stressed that it is necessary to build a more systematic work aimed at high results.One of the key topics of discussion at the meeting was the implementation of gender policy in the public service system.In this direction, the Agency for Civil Service Affairs of the Republic of Kazakhstan is working to improve the professional and leadership competencies of women. Seminars and trainings on such topics as "Women's leadership", "Career and family" have been held this year.: how to keep a balance", "Women's Leadership: Balancing career and family" with the participation of local and foreign experts, who trained 876 civil servants.The Chairman noted that for more effective results, it is necessary to involve a male audience in gender education. In addition, it is necessary to strengthen information and explanatory work in the regions.Also at the meeting, the members of the National Commission agreed that it is necessary to consolidate gender expertise at the legislative level in Kazakhstan.The National Commission already has successful cases of normative work. This year, its members participated in the development of the Law of the Republic of Kazakhstan "On Amendments and additions to certain Legislative acts of the Republic of Kazakhstan on ensuring the rights of women and the safety of children."Also, together with the deputies of the Parliament, work has begun on revising the norms of marriage and family legislation regarding the payment of alimony.This year, an Action Plan was approved to ensure the promotion of equal rights and opportunities for men and women for 2024-2027. The institute of freelance advisers to akims on gender equality issues has been introduced.During the year, the National Commission confirmed the status of a sought-after dialogue platform between the government, civil society and international organizations. Thus, the pilot project "One-Stop-Service" initiated by the National Commission has shown its effectiveness – about 50 criminal cases have been considered, most of which are related to sexual abuse of children, over 700 women and children who applied received emergency legal, psychological and expert assistance.As part of the international campaign "16 active Days against violence", about 7 thousand events were held in the republic, covering more than 430 thousand people.The practice of visits by expert groups of the National Commission to the regions was effectively used. A comprehensive analysis of the problems, assessment of regional peculiarities and development of solutions were carried out on site.The Commission members have prepared a number of initiatives to ensure the digital safety of children and suicide prevention among adolescents and young people.The charity project "Salamatty Kazakhstan Train", which is in demand by residents of remote areas, this year reached over 100 thousand people with medical, psychological, legal and mediation assistance. Special attention was paid to mothers with many children, as well as socially vulnerable families raising children with disabilities who found themselves in a difficult life situation.The potential of the regional commissions on women's affairs and family and demographic policy was actively involved in this project, which made it possible to expand the coverage of the population and study their sensitive issues.Thanks to the IT-Aiel project, this year more than 3,000 unemployed women who want to work in the IT field have completed a training program on freelance and e-commerce tools. The number of applications submitted (5,151) has doubled this year.The National Commission ensures Kazakhstan's positioning as a responsible member of the global community. Members of the National Commission made a presentation on Kazakhstan's fulfillment of international obligations in the field of family and gender policy at the discussion platforms of the 68th session of the UN Commission in New York, the Council of Europe and other international venues. Press Service of the Ministry of Culture and Information of the Republic of KazakhstanSource : https://www.gov.kz/memleket/entities/mam/press/news/details/906119
Agro-industrial complex: 16 major investment projects are being implemented in Zhambyl region this year 24.12.2024
In the Zhambyl region, 16 investment projects worth 14.6 billion tenge are planned to be implemented in the field of the agro-industrial complex this year. To date, 12 projects (10.8 billion tenge) have been launched, 163 jobs have been created.Alel-Agro JSC has launched an incubator, 5 farms have implemented water-saving technologies, and safflower oil production has increased. A fishery of KazAkva Alliance LLP was also opened, and a granary of Elnur Adilgroup LLP was built. BNK Leasing LLP has opened a service center for agricultural machinery, Rich Gold LLP has launched apple juice production, and the construction of the Kausar farm vegetable storage facility has been completed.It is planned that four more projects will be launched by the end of the year.In total, 36 projects worth 245.4 billion tenge are planned to be implemented in the agro-industrial complex from 2024 to 2027. Among them, 5 dairy farms, 3 poultry farms, 8 vegetable storages, 10 projects for processing agricultural products, 7 projects for the introduction of water-saving technologies, as well as the construction of a feedlot. In addition, projects will be implemented to develop fisheries and create a service network for equipment maintenance.Also, within the framework of the program to replicate the experience of North Kazakhstan region, 15 investment projects were financed: the construction of a vegetable storage and dairy farm, the production of apple juice, fish feed, the processing of bird droppings and sheep wool, the introduction of water-saving technologies. According to the plan, a number of projects will be launched before the end of the year.It is also planned to implement projects for the production of French fries and the processing of skins into a feed additive at the expense of the local budget. These projects will increase milk production in the region by 6.5%, increase the capacity of agricultural storage facilities by 10%, and also help to stabilize prices and create permanent jobs.Source : https://www.gov.kz/memleket/entities/zhambyl/press/news/details/905745
71 teachers of Zhambyl region became the winner of international and national competitions 24.12.2024
Akim of Zhambyl region Yerbol Karashukeyev met with teachers of schools and colleges and discussed issues of education development.The head of the region thanked the teachers for their tireless work for the bright future of our country.- Teachers educate decent citizens, laying the foundations of tomorrow and shaping the intellectual potential of the country. The statement of the great Abai sounds more relevant than ever: "Adamnyn adamshylygy – zhaksy ustazdan" (The best in a person is from a Teacher).Head of State Kassym-Jomart Tokayev pays special attention to education issues with an emphasis on improving its quality and meeting modern requirements. Large-scale work is underway in the region to create favorable conditions for the successful development of the education system," said the governor of the region.Erbol Karashukeyev also highlighted the main achievements of schoolchildren and teachers this year.In total, 6 Zhambyl teachers were awarded the honorary title of "Kazakstannyn enbek sinirgen ustazy" ("Honored Teacher of Kazakhstan"), three of them this year.This year, 71 teachers have won international and national competitions.In the international competition named after the famous professor in Kazakhstan Askar Zhumadildaev and IMPACT, our teachers took the first place in the team competition, in the republican competition "Mathematical Regatta" - the third place, became winners of the republican competitions "The best methodologist", "The best homeroom teacher". Also, 8 teachers became the winners of the "Best Author's Program" competition.For 13 years, 51 teachers have won the title of "Best Teacher", 19 of them work in rural schools.According to the results of the republican contest of scientific projects, students of Zhambyl schools retain the status of the "Best Team" for the 15th year in a row. The title of the "Best team" was also confirmed by Zhambyl schoolchildren following the results of the republican Olympiad. According to the results of the PISA study, Zhambyl schools also won the 1st place in the republic.During the meeting, Erbol Karashukeev awarded teachers for achievements in the field of education.In particular, cash certificates (in the amount of 300 MCI) were awarded to 6 winners of the regional stage of the republican contest "The Best Teacher-2024".Five teachers became holders of the honorary title and the badge "For contribution to the educational sphere of Zhambyl region". They were also awarded cash certificates.Congratulatory letters from the akim of the region were also presented to the participants.Natalia Volotko, geography teacher at the Daryn Regional specialized boarding school for gifted children, Honored Teacher of Kazakhstan, and Mereke Kenzhebekova, biology teacher at the S.Seifullin Secondary School in Shuisky district, winner of the republican contest "Best Teacher-2024", also spoke. Source : https://www.gov.kz/memleket/entities/zhambyl/press/news/details/905952
Budget expenditures on social assistance and social security have increased 1.2 times in Zhambyl region this year. 24.12.2024
Akim of Zhambyl region Yerbol Karashukeyev took part in a meeting of the deputy faction of the regional branch of the Amanat party.The head of the region informed about the results of the implementation of the indicators of the Roadmap for the implementation of the election program of the party "Halyken Birge!".24.6 billion tenge has been allocated for subsidizing the agro-industrial complex. Following the results of 10 months, 14.9 billion tenge of investments were attracted to the sphere.The total sown area was 626.7 thousand hectares, 3.6 million tons of harvest were harvested. 151.4 thousand tons of agricultural products worth $29.1 million were exported.Within the framework of the Auyl Amanaty project, in 2023-2024, more than 4 thousand projects in 38 rural districts were financed in the amount of 25.5 billion tenge. 152.2 thousand cattle were purchased.1,156 small and medium-sized business projects have been funded. Loans have been issued to 38.6 thousand entrepreneurs through financial institutions. As a result, the volume of products produced by SMEs increased by 23.9 percent. This year, 46.3 billion tenge has been allocated for social support and social security, which is 1.2 times more than last year. In accordance with the President's instructions to create 100 jobs per 10,000 people, more than 11,000 jobs have been created by supporting entrepreneurial initiatives (the plan is 8.8 thousand).More than 64,000 jobs have been created as part of the regional employment map, of which 45.9 thousand are permanent. 49.8 thousand Zhambyl residents were involved in active employment measures (plan 47,951). There are 2.2 thousand citizens with special needs among them.635.7 square meters of housing were commissioned. 78 houses for 3,709 apartments are under construction in the region, 41 houses will be commissioned by the end of the year.1,575 apartments worth 23.2 billion tenge were purchased in the region for large families and socially vulnerable segments of the population.This year, budget funds have been allocated twice as much for housing construction and apartment purchase: in 2023 - 23.2 billion tenge, in 2024 - 40.8 billion tenge.Through the construction and purchase of apartments, it is planned to provide housing for 1,963 families from socially vulnerable categories, which is 75% more than last year. 140 young families will receive housing within the framework of the Aulieata Zhastary project.This year, 710 km of roads have been covered by reconstruction, construction, and repair projects. By the end of 2024, the share of local roads in good and satisfactory condition will increase to 99%, and the share of streets in populated areas will increase to 87%.155 buses have been added to the region's bus fleet.37 settlements are provided with drinking water. As a result, the level of provision of drinking water to the population is 98.1 percent.Erbol Karashukeyev also dwelled on the work done in the social sphere.36 educational facilities (for 10,600 places) are being built in the region. To date, 13 educational institutions have been put into operation, including three within the framework of the national project "Comfortable School". Two more facilities are planned to be commissioned by the end of the year. As a result, the problems of 7 schools with a shortage of student places, 3 three-shift, 3 dilapidated, and 2 emergency schools will be solved. Major repairs of 10 educational facilities have been carried out.3.1 billion tenge was allocated for the modernization of schools: 1.9 billion tenge - to provide 215 schools with classrooms of a new modification, 1.2 billion tenge - to ensure the safety of educational facilities.21 healthcare facilities have been commissioned. As part of the Rural Healthcare Modernization project, 2 outpatient clinics, 10 paramedic and obstetric centers, and 6 medical centers have been opened. Two medical facilities have been completely renovated.18 units of equipment and 38 ambulances were purchased, the level of medical equipment reached 96.7% (2023 - 91.9%).6 cultural facilities, 5 sports and recreation complexes and 103 sports grounds were built and put into operation.Akim of the region focused on measures to support socially vulnerable segments of the population, youth, and the results of environmental projects.The deputies who took part in the discussion of the report raised a number of issues. Akim of the region gave specific instructions to the heads of departments on each issue.Source : https://www.gov.kz/memleket/entities/zhambyl/press/news/details/906116
A ski race sports challenge has been launched in North Kazakhstan Region 24.12.2024
A large-scale ski race was held in the village of Lobanovo, Ayyrtau district, which gathered about 300 participants. Both professionals and outdoor enthusiasts took part in the launch.People from all over the region took part in the mass sports event. Some started skiing for the first time, proving that it's never too late to take the first step towards an active lifestyle. A new sports challenge was launched with the race, which aims to unite the regions of Kazakhstan through sports. The baton was passed to Kostanay region.Source : https://www.gov.kz/memleket/entities/sko/press/news/details/905859
Results of the year. Youth policy 24.12.2024
Providing comprehensive support to young people is one of the main tasks of our state.This year, the second stage of the Aktobe Zhastary housing program was held, for the implementation of which a total of 1 billion tenge was allocated. Over 70 young families have been provided with housing under the program. 500 million tenge has been allocated from the local budget for these purposes.It should be noted that Aktobe region is the leader in the country in youth employment within the framework of the Zhasyl El project. So, in 2024, 2,100 young people were provided with jobs. It is expected that at least 3,500 young people will be employed under the project next year.In addition, 418,000 residents took part in the Taza Kazakhstan campaign, 106 thousand yards, 1,500 social facilities were cleaned, 363 thousand trees were planted in settlements.At the same time, grants were provided to 28 young people for the implementation of social projects by the ZHAS PROJECT. Applications for support of youth initiatives have been accepted under the "Tauelsizdik Urpaktary" project, which plans to support about 200 young people.Source : https://www.gov.kz/memleket/entities/aktobe/press/news/details/905864
Results of the year. Highways 24.12.2024
Due to its geographical location, Aktobe region has a high transit potential.This year, it was planned to implement 193 projects worth 64.5 billion tenge to improve the quality of local roads. By the end of the year, the share of local roads in the standard condition reached 78% (in 2023 – 75%).To date, more than 500 kilometers of road surface (asphalt and foundation) have been laid in the region.In the city of Aktobe, work is underway to bring more than 200 road sections to a standard state, which is 47 kilometers of streets.All necessary documents for the reconstruction of two sections have been prepared on the Samara-Shymkent international highway in the direction of Aktobe-Khromtau. Work has begun on the construction of a four-lane highway and reconstruction of communications in the area from the residential area of Olke in Aktobe to the village of Akzhar in Khromtau district.In addition, the average repair of the republican highway Kandyagash – Emba– Shalkar– Irgiz (401 kilometers), which is part of the Center-West transport corridor, continues. Currently, 25 kilometers of the road have been put into operation, and work continues jointly with Kazakavtozhol.Also, on behalf of the Head of State, the construction of the 90-kilometer republican highway Aktobe-Kandyagash, connecting Aktobe and Atyrau regions, has been completed.Source : https://www.gov.kz/memleket/entities/aktobe/press/news/details/905992
Akim of Aktobe region Askhat Shakharov held a reception for citizens 24.12.2024
The problems of the population were also heard by Chairman of the regional maslikhat Gulkasima Suentayeva, akim of the city Azamat Beket, chairman of the Aktobe regional branch of the Amanat party Erbol Danagulov, chairman of the city maslikhat Anar Darzhanova, heads of departments and departments, deputy mayors of districts.Residents who made an appointment with the governor of the region were interested in providing housing, landscaping yards, obtaining loans for the development of personal subsidiary farms and other problems. For example, residents of Aksai village in Kobda district asked for assistance in providing electricity to farms. And the villagers from Bestamak, Alginsky district, asked for sound insulation boards to be installed along the highway running through the center of the village. Residents of one of Aktobe's residential areas raised issues of providing drinking water, repairing roads and street lighting.The akim of the region listened to all the appeals and instructed the responsible authorities to promptly and legally consider and take action on each of the issues.Source : https://www.gov.kz/memleket/entities/aktobe/press/news/details/906028
Measures of state support for domestic producers in the field of electric power industry discussed in Astana 24.12.2024
Today, the Ministry of Energy, together with the Association of Electric Machine Builders of Kazakhstan and the Association for Assistance in Infrastructural and Innovative Development, organized a round table to discuss government support measures for domestic manufacturers of equipment and technologies.The meeting was attended by representatives of government agencies, deputies of the Mazhilis, heads of industry associations, domestic manufacturers and international experts.Welcoming the participants, Vice Minister of Energy Bakytzhan Ilyas noted the importance of the meeting.- Today's round table is a great opportunity for a constructive dialogue between the Government, the Mazhilis of Parliament, business and the expert community. We must join forces to develop new approaches that will ensure the successful implementation of the National Project to modernize the Energy and Utilities sectors," the Vice Minister said.According to the Vice Minister, today, the electric power industry occupies a key place in the economy of Kazakhstan. This industry accounts for more than 8% of GDP, and the volume of electricity generated last year amounted to more than 110 billion kilowatt hours. At the same time, about 70 percent of the equipment of electric power plants and electrical networks require modernization, which opens up great prospects for domestic producers.- The national project "Modernization of the Energy and Utility Sectors" is aimed at updating energy infrastructure, increasing energy efficiency and introducing modern technologies. Special attention is paid to the participation of domestic producers in the implementation of this national project. It is important that Kazakhstani companies become the main suppliers of equipment, and in this regard, the Government continues to implement state support measures, including the conclusion of long-term contracts and the purchase of locally produced equipment," Bakytzhan Ilyas said.The Vice Minister noted that work is already underway in this direction. For example, for 9 months of this year, the volume of purchases of goods and services amounted to 21.2 trillion tenge. For 11 months of this year, the amount of long-term contracts concluded with domestic producers increased by 34 percent and amounted to 372 billion tenge.Also, during the event, international experts shared their experience in developing energy infrastructure and supporting domestic producers in this context.Following the results of the round table, recommendations were developed for government agencies that should have a qualitative impact on the implementation of the National Project "Modernization of the Energy and Utility Sectors" and increase the share of Kazakhstani content in energy company purchases.Source : https://www.gov.kz/memleket/entities/energo/press/news/details/905967
The head of the region, Serik Shapkenov, met with residents of the Makati district 24.12.2024
Today, the head of the region, Serik Shapkenov, met with residents of the Makati district. At the meeting, socio-economic indicators and the direction of further development of the district were discussed, the press service of the akim of the region reports.Serik Shapkenov made a presentation on the work done at Makat.The problem of emergency houses is urgent in the area. To solve it, 28 semi-detached houses (56 apartments) were purchased. Residents were relocated to 14 houses (28 apartments) in December, and 20 more families will have housewarming parties in February next year.The head of the region also spoke about the ongoing work in the field of education.- Two modern BINOM schools have opened in the regional center, and construction of two more has begun. These works will be carried out in stages. There are plans to build such modern educational institutions in Kulsary and Makat. All conditions must be created for children to receive a high-quality education. These schools are equipped with modern technologies and have all the necessary equipment. In addition, a positive expert opinion was received for the construction of an extension for 250 places to primary school No. 2 in the village of Makat with the sponsorship of NCOC. Construction is expected to begin next year," Shapkenov said.A question often raised by Makati residents is the construction of bus stops. It is planned to build 54 stops next year.Due to changes in the design and estimate documentation for the overhaul of the railway platform in the village of Dossor, construction work was postponed to next year. Serik Shapkenov instructed the district governor to keep this issue under strict control.Residents of Makat raised other issues such as employment, housing and clean drinking water.The head of the region said that the issues raised at the meeting would be resolved in stages and within the framework of the law. Later, he received citizens on personal matters and answered their questions together with competent specialists.Instagram Facebook and Instagram account of the meeting of the akim of the region with the residents of the Makati district was broadcast live on the official pages of the regional akimat on social networks Facebook and Instagram.After the meeting, Serik Shapkenov got acquainted with the state of social facilities.First, he visited a 60-apartment three-story building being built in the village of Makat.The work has been completed by 60%. Serik Shapkenov instructed the responsible authorities to amend the POA and speed up the work on the infrastructure.Next, he got acquainted with the condition of the building of the district defense department, which needs major repairs. The facility, built in 1974, has not been repaired before, and the roof leaks during precipitation. The heating boiler is also outdated. Serik Shapkenov noted that the facility needs to be overhauled or a new standard building built.During the trip, the head of the region visited the empty old akimat building, which is also in need of renovation. The local authorities plan to turn it into a social services center. As of today, a positive conclusion of the state expertise has been received. The head of the region instructed to speed up the competitive procedures.Source : https://www.gov.kz/memleket/entities/atyrau/press/news/details/906055
More than 2,600 road workers are involved in snow removal operations in Astana 24.12.2024
The municipal services of the capital continue round-the-clock uninterrupted work on snow and ice removal. Since the beginning of the winter period, their forces have removed more than a million cubic meters of snow from the city, the official website of the city akimat reports.On December 19, more than 2.6 thousand road workers and almost 1,200 units of special equipment left the streets of the city to remove snow and ice from the streets.During the night from December 18 to December 19, more than 8.4 thousand cubic meters of snow were transported to the snow ranges by 639 heavy cargo flights.Since the beginning of the winter period, more than 1.1 million cubic meters of snow have been transported from the capital on 92,188 flights.According to the rules, first of all, areas with very heavy traffic are cleared in the city so that there is no congestion on the roads. Areas with moderate intensity are also being cleared of snow — squares, station areas, sidewalks, access roads to social facilities, etc.Cleaning on central streets, passenger transport routes, bus stops and sidewalks is a priority.There are several equipped snow training grounds in the capital. They are equipped with a system for reading the license plates of dump trucks, video surveillance cameras are installed here, and lighting is connected.We ask residents and guests of the capital to be careful on the roads, observe safety regulations, and refrain from long-distance travel in case of a storm warning.In case of an emergency, please call 112. Source : https://www.gov.kz/memleket/entities/astana/press/news/details/905472
Taza Kazakhstan: the fathers of the capital launched a snow removal challenge 24.12.2024
A snow removal challenge "100 mektep — 1000 ake" is being held in Astana schools as part of the "Taza Kazakhstan" campaign, the official website of the capital's akimat reports.Representatives of the Council of Fathers of the special boarding school No. 1 in Astana launched a snow removal challenge at the educational institution where their children study."As the great Abai said, 'If you want to build a strong state, start by raising a family.' Family is the basis of personality formation. Her cohesion directly depends on the role of the father. We strive to involve fathers in active participation in the educational process. Cleanliness and order in educational institutions is the responsibility of every citizen," the organizers noted.It is noted that the challenge is planned to be brought to the national level, transferring it in the format of a relay race to other cities of Kazakhstan. In this way, the participants of the action contribute to strengthening national unity and fostering the patriotic spirit of the youth.Source : https://www.gov.kz/memleket/entities/astana/press/news/details/905518
An unusual competition for the promotion of family values was held in the capital. 24.12.2024
Astana hosted a family competition "Azhe, kelin, nemere. Ata, bala, nemere," the official website of the capital's akimat reports.The event was attended by the best dynasties of the five districts of the capital within the framework of the generational succession project. Its purpose is to popularize national traditions, promote family values, and demonstrate unity between brothers and sisters.The competition is organized by the Council of Veterans with the support of the Akimat of Astana. This program, which has been in existence for three years, involves the development of the family institute.All the families who took part in the competition told about their achievements and revealed the themes of a revered grandfather, a respected grandmother, an exemplary father, a good daughter-in-law, daughter and son.The Khamzin family, a dynasty of pilots from the Yesilsky district, proudly said that 28 family members work in the aviation industry. Maral Khamzin's mother was the first female flight attendant of Kazakh origin, and today she is a revered grandmother of grandchildren.Chairman of the Council of Veterans of Astana Sansyzbai Yesilov noted that such a competition fosters in children a love of hard work, respect for elders, caring for the younger, learning the rules of common morality, preserving the traditions and values of our people.At the end of the competition, all the performing families were awarded special prizes.Source : https://www.gov.kz/memleket/entities/astana/press/news/details/905519
Voucher financing of preschool educational organizations is being introduced in Astana 24.12.2024
In order to increase the transparency and efficiency of financing preschool education, a voucher financing project is being implemented in Astana, the official website of the capital's akimat reports.First of all, the system provides for transparency of the entire financing process, where the principle "money goes to the child, not to the institution" is implemented. Funds are credited and transferred only after the parents confirm the information in the child's report card.Since December 17, 2024, explanatory meetings have been held with the heads of preschool organizations in the city on the topic "Transition to a voucher financing system for preschool organizations in Astana."According to the established schedule, the first heads of private and public kindergartens in five districts of the city are currently trained. The total number of participants is 600 people. The meetings were attended by representatives of JSC Financial Center and the Indigo information system.After the training of the first managers and staff of preschool organizations, this system will also be explained to parents.Source : https://www.gov.kz/memleket/entities/astana/press/news/details/905616
In order to develop mass sports, a Nordic walking training was held in Astana 24.12.2024
A training session on a special sport, Scandinavian walking, was held in Ataturk Park in the Baikonur district of the capital, the official website of the Astana Akimat reports.The purpose of this event is to develop mass sports among the population and promote a healthy lifestyle.In total, about 50 people, led by the veteran community of the Baikonur district, took part in the open-air event."Today we are participating in a special sport. The pensioners of our district are not bothered by any weather. The old people are especially excited. Holding such an outdoor event is also very beneficial for our health. We are ready to participate again. On behalf of the veterans, we express our gratitude," said Kuanysh Namazshamov, participant of the event, Chairman of the Veterans Council of the Baikonur district.In the future, training in this sport is planned to be conducted annually on an ongoing basis.Source : https://www.gov.kz/memleket/entities/astana/press/news/details/905771
The best energy workers were awarded in Astana 24.12.2024
The solemn event dedicated to the Day of the Power Engineer emphasized the importance of the work of those who ensure stable energy supply to the capital, the official website of the Mayor's Office of Astana reports.Deputy Akim of Astana Yersin Otebayev, opening the award ceremony, congratulated those present on their professional holiday. He noted that energy is the heart of the urban economy, and power engineers are the people who provide comfort in every home in the capital."You are making an invaluable contribution to the development of the city by providing a stable supply of heat and electricity. Thanks to your diligence and professionalism, residents receive heat and light, and social facilities function smoothly. I sincerely thank you for your hard work and dedication. May your work always be appreciated, and may your energy never run out," said Yersin Otebayev.Congratulations were also expressed by Chairman of the capital's maslikhat Yerlan Kanalimov, who also noted the importance of the energy sector for the socio-economic development of the country."Energy is the basis of stability and development of the capital and the whole country. Your job requires high responsibility, hard work and continuous professional development. You work day and night to ensure uninterrupted power supply to residential buildings, social and industrial facilities. Your work plays an important role in the sustainable functioning of all sectors of the economy. Thank you for your dedication to the profession and dedication with which you work for the benefit of the city and the whole country," he said.The power engineers were awarded with letters of thanks and certificates of honor for their high professionalism, dedication and many years of dedicated service to the cause.It should be noted that projects aimed at the development and modernization of the city's energy infrastructure are the basis for the stable functioning of the capital. The commissioning of new thermal power facilities, such as the Yugo-Vostok, Turan and TPP-3 gas thermal power plants, allowed the city to achieve a surplus of heat. The completion of the second stage of the Turan gas transmission system and the launch of the new Telman station in the coming years will ensure reliable heat supply to areas with active residential development. These projects make an important contribution to the sustainable development of Astana, improving the quality of life of citizens and maintaining comfortable working and leisure conditions.After the end of the official part, the leading creative teams of the capital took to the stage, who congratulated the participants of the event with musical numbers.Source : https://www.gov.kz/memleket/entities/astana/press/news/details/905914