Politics
965 thousand square meters of housing are planned to be commissioned in Aktobe region in 2025 09.02.2025
The meeting of the staff chaired by the regional akim Askhat Shakharov reviewed the pace of housing construction in the region, as well as the construction of social facilities.The head of the Aktobe region's Department of Construction, Architecture and Urban Planning Yerzhan Muzdybayev noted that there is an increase in the pace of housing construction in the region. For example, according to the results of last year, 964 thousand square meters of housing were commissioned in the region, which is 14 thousand square meters more than the planned target. In 2025, it is planned to build 595.3 thousand square meters of individual housing and 354.7 thousand square meters of apartment buildings. In the cities of Aktobe and Alga, there are plans to build 142 thousand square meters or 1,857 apartments. In total, it is 965 thousand square meters.More than 49 billion tenge has been allocated from the National Fund, republican and regional budgets for housing construction, social and infrastructure projects.Within the framework of the national project "Cozy School", 12 schools are planned to be commissioned this year. The construction of 22 mobile educational facilities will continue and 3 new projects will be implemented, including the IT Hub. Also, the construction of a 300-seat kindergarten for children with special needs will begin in Aktobe.Within the framework of the national project "Modernization of Healthcare in the Village", 14 facilities will be put into operation for the benefit of the people. This year, it is planned to complete construction work adjacent to the hospital in Zhanakonys, build a medical clinic in Zhem and a medical center in the village of Utek, Kobda district.In addition, the construction of a culture house in Khromtau will be completed. In addition, a project for a 5,000-seat multifunctional sports complex and a stadium in the regional center is being developed. Physical education and health complexes in Shalkar, Khromtau, Kenkiyak and swimming pools in Shubarkuduk and a number of other villages will be commissioned.The regional akim instructed the Department of Construction, Architecture and Urban Planning, together with the akims of the city of Aktobe and districts, to ensure the timely and high-quality completion of all facilities planned for 2025. Also, Askhat Shakharov noted the importance of organizing the construction of access roads, sidewalks and lighting of social facilities."To ensure the timely and high-quality implementation of all construction projects, it is necessary to strengthen control over their implementation. This applies not only to meeting deadlines, but also to the efficiency of using allocated resources, since these projects are aimed at the benefit of the population of the region and the country as a whole," the regional head said.Source : https://www.gov.kz/memleket/entities/aktobe/press/news/details/925212
Regional flood preparedness: prevention and protection 09.02.2025
Preparations for the upcoming flood season continue in the regions. Preventive measures are being taken in areas and settlements prone to flooding, including the construction and strengthening of protective dams and embankments, the installation of drainage channels and ditches, snow removal, the preparation of inert materials and bags, as well as the repair of water supply structures and storm sewer systems.
In the Akmola region, a visit to areas prone to spring flooding is being carried out. The villages of Mailan, Olenty, and Sileti, located in the watersheds of the Ereimentau district, were visited. A large hydraulic structure, the Sileti reservoir, is located in Sileti. Flood preparation work was carried out, the readiness of rescuers was checked, and the implementation of the action plan carried out by the local emergency management organization was checked.
Three large rivers flow through the territory of Almaty: Bolshoy, Malyi Almaty and Esentai, and their overflow can cause flooding and landslides in the city. In order to reduce the risk of flooding in the city, work is underway to clean, reconstruct and improve the channel of the Bolshoy Almaty River with a total length of 5.7 km. In addition, the channels of small rivers, bridge crossings and the canal system are regularly cleaned of ice jams and debris. In total, more than 3 km of small river channels have been cleaned. 291 thousand cubic meters of snow were removed from the city. A snow melting station with a capacity of up to 1,200 cubic meters per day has started operating in Almaty. Its launch is due to the increase in snow accumulation and the load on the city's infrastructure. The new approach will reduce the time and resources required to transport snow outside the city and reduce environmental damage.
A technical competition was held in Zhambyl region as part of preparations for the flood season. The competition presented specialized equipment, including high-mobility equipment, pumping stations and motor pumps for pumping water, floating devices for evacuating people from flooded areas, and emergency rescue equipment. In addition, comprehensive training continues, including interaction with local executive bodies and training the population in safety measures during the flood period.
In the Karaganda region, readiness for the flood period is being checked. Emergency services workers are visiting settlements at risk of flooding and checking the implementation of preparatory work, material and technical means, the readiness of forces and equipment for the spring period, and the main hydraulic structures of the region are being inspected. Local executive bodies are organizing snow removal from settlements. About 800 thousand m³ of snow has been removed. Reception points for the evacuated population have been prepared. Contracts have been signed for ice-breaking work on the rivers of the region. Currently, sanitary water discharge from the main reservoirs is being carried out.
In Pavlodar region, Aktogay and Bayanaul districts are flood-prone. In 2024, 18.89 km of protective dams and embankments were built, repaired, and strengthened in 15 settlements of the region, 4.8 km of diversion channels were repaired and built, 24 water culverts were installed and replaced under automobile and railway roads.
An inspection of the condition of water bodies, rivers, and dams was carried out, as well as an assessment of the technical condition of flood protection drainage systems. In the river basin sections, dredging work was carried out on the Talinka River in the Zhambyl village of the Aktogay district at a distance of 7.8 km. This year, an earthen embankment with a length of 2 thousand meters was built in the Zhalauli village of the Aktogay district. In addition, three pits with a total capacity of 200 thousand cubic meters are equipped to collect meltwater. Special attention is also paid to the issues of hydrometeorological monitoring. Commission visits were carried out to regions prone to flooding to assess the potential risks of the flood season. In the Aktogay district, the settlements of Kozhamzhar, Mutkenov, Zhalauly, Auelbek, in the Bayanaul district, Kokdombak, K. Satpayev, M. Shorman were examined. Based on the results of the inspection of settlements and roads, relevant recommendations were made to representatives of interested services and organizations, while attention was paid to the timely opening of water supply pipelines and, including, snow removal from remote settlements.
In order to monitor and analyze the condition of snow measurement routes in the region and the snow reserve in mountainous areas, a visual inspection was carried out by the working group of the Turkestan region's Emergency Situations Department.
In Kostanay region, all necessary technical equipment, including motor pumps and additional special equipment, was checked. The working group visited Naurzym district and held meetings with representatives of local executive bodies. During the meeting, flood prevention measures and the results of last year's activities were discussed. The readiness of the equipment was checked, and the possible places of stormwater inflow were monitored.Particular attention is paid to the condition of the dam located in the village of Burevestnik. Specific recommendations were given to local executive bodies to monitor the dam and ensure its safety.
Source : https://www.gov.kz/memleket/entities/emer/press/news/details/925379
"Kyzylzhar" and "Yasny" physical education and health complexes put into operation 01.02.2025
Training has begun in both sports complexes. All conditions have been created for children and adolescents to engage in sports, several sports sections are operating. Recall that last week, during a tour of the city, the regional governor Askhat Shakharov checked the readiness of the facilities to receive children. He noted that the development of sports infrastructure is one of the important tasks of educating young people to a healthy lifestyle. The area of the "Kyzylzhar" physical education and health complex is 1601.4 m². There are game rooms for volleyball, basketball, table tennis, as well as a wrestling hall and a 100-seat stand.The "Yasny" physical education and health complex covers an area of 1223 square meters and offers opportunities for practicing such sports as volleyball, basketball, and mini-football.In accordance with the presidential order to prioritize the development of mass and children's and youth sports, work is continuing on the construction of sports facilities in the region. In February, three more physical education and health complexes should be opened in the settlements of Zarechny-3, Kenes Nokin village and Akzhar. According to the Department of Construction, Urban Planning and Architecture, this year a sports complex for people with disabilities in the former "Dinamo" in the regional center, Altyn Orda microdistrict, will be commissioned. Also, a sports complex will be opened in the city of Temir, Temir district, and a swimming pool in the village of Shubarkuduk. Reconstruction of the sports complex in Kenkiyak will be completed. It is also planned that children from the villages of Bozoi and Shilikti of the Shalkar district, the city of Khromtau and the village of Kurylis of the Irgiz district will also train in the new hall this year. t.me/aqtobe_oblysy_akimdigiSource : https://www.gov.kz/memleket/entities/aktobe/press/news/details/929298
Athletes begin training at the Dostyk swimming pool 01.02.2025
More than 800 young athletes will be able to continue training in the pool, where all the necessary conditions have been created. The building has been operating since 2014. It has not been repaired since it was put into operation. The closure of the complex was due to water leakage from the roof, subsidence of the soil, and water accumulation in the basement. The contractor company "Altair-SK 7" LLP, within seven months, carried out internal and external repairs for 388.12 million tenge from the allocated budget, and restored the pool. Now the sports complex is ready for training and competitions. It is worth noting that during the overhaul, the athletes' training was not stopped, they trained in another building. "The overhaul lasted seven months and was completed on time. The main problem was in the roof and basement. The roof was replaced, insulation was carried out in the basement. 1,600 square meters of tiles were replaced, and the ventilation and heating systems were updated. "Parents and children are happy to see the renovated building," says the pool director, Yermek Zhetimekov. In accordance with the President's order to prioritize the development of mass and children's and youth sports, work on the construction of sports facilities continues in the Aktobe region. t.me/aqtobe_oblysy_akimdigiSource : https://www.gov.kz/memleket/entities/aktobe/press/news/details/929304
The issue of developing the compulsory medical insurance system was discussed in the capital 01.02.2025
A meeting on the development of compulsory social health insurance was held under the chairmanship of Deputy Akim of Astana, Erik Meirkhanov, the official website of the capital's akimat reports.The meeting was attended by the Head of the Public Health Department Aliya Rustemova, Head of the Capital's Department of Employment and Social Protection Ilya Skub, Director of the Capital Branch of the Social Medical Insurance Fund JSC Gulzhan Shaikhybekova, and medical organizations of the city.The meeting discussed the development of the compulsory health insurance system.As of January 1, 2025, the level of coverage of the compulsory health insurance system in the capital was more than 83%, which is higher than the corresponding period last year.“For the majority of uninsured, employers do not regularly transfer contributions or do not transfer them at all. It is important to strengthen explanatory work among employers and citizens so that they understand the benefits of health insurance and the need for regular contributions,” the director of the Fund’s branch said in his report.In addition, a set of measures was proposed to inform citizens about the rules for participating in the compulsory health insurance system, their rights and opportunities, as well as the consequences of not having health insurance. A set of measures was also proposed to involve the population in the compulsory health insurance system, including: organizing public reception rooms to conduct explanatory work for the population, target groups - mothers with many children, service professionals, individual entrepreneurs and self-employed citizens.“It is necessary to identify the main reasons why part of the population is excluded from the compulsory health insurance system. This will help to develop effective solutions to raise citizens’ awareness and improve the quality of medical services. It is important not only to identify problem areas, but also to propose specific steps to eliminate them. Based on the information received, targeted measures will be developed and large-scale explanatory work will be carried out among various groups of the population,” said Erik Meirkhanov.Source : https://www.gov.kz/memleket/entities/astana/press/news/details/929286
"Smart traffic lights" to be installed in Semey 01.02.2025
SMEU Astana LLP presented a project to implement an automated traffic management system (ATMS) aimed at improving the safety and efficiency of Semey's transport infrastructure.The goal of the project is not only to solve road infrastructure problems, but also to create conditions for the prevention of future traffic accidents. The introduction of new technologies will be part of the strategic development plan of Semey, which includes public transport, road safety and urban infrastructure.The company representatives who attended the presentation presented such innovations as the real-time operation of traffic lights and the "AJO Inspector" system, which allows you to monitor the condition of intersections, pedestrian traffic lights with sound, adjustable, projection, active pedestrian crossings.The introduction of an automated traffic management system will significantly increase the efficiency of the city's transport system, reduce average travel time by 20%, reduce traffic load by 10%, increase the throughput of intersections by 25%, and also identify problem areas of streets and roads with 100% accuracy.The Akimat of the Abay region is interested in implementing the project. In this regard, the head of the region gave relevant instructions to the responsible departments of the Police Department and the Semey city akimat.Source : https://www.gov.kz/memleket/entities/abay/press/news/details/929284
More than 1,800 special vehicles were produced for snow removal in Astana on the day shift 01.02.2025
Snow removal work is ongoing in the capital around the clock, the official website of the Astana akimat reports.On the morning of February 1, more than 2,600 road workers and more than 1,800 special equipment were mobilized to clear snow in the capital.On the night of February 1, public utilities removed about 49,190 cubic meters of snow from the city in 3,744 heavy truck flights.Since the beginning of the winter season, more than 4 million 570 thousand 183 cubic meters of snow have been removed from the city to landfills in 359,169 heavy truck flights.First of all, according to the rules, places with the highest traffic intensity are cleared to avoid traffic jams on the roads. Also, areas with medium intensity - squares, areas near train stations, sidewalks, entrances to social facilities, etc. will be cleaned.Cleaning of central streets, places where passenger transport routes pass, stops and sidewalks is also a priority.There are several equipped snow polygons in the city. They are equipped with a system for reading license plates of dump trucks, video surveillance cameras are installed here, and lighting is turned on.We ask residents and guests of the capital to be careful on the roads, follow safety rules, and not go on long trips if there is a storm warning.In case of an emergency, please call "112". Source : https://www.gov.kz/memleket/entities/astana/press/news/details/929283
The operational team of the Ministry of Emergency Situations of Kazakhstan visited the East Kazakhstan region 01.02.2025
On January 30-31, 2025, Deputy Chairman of the Committee for Civil Defense and Military Units Alexey Sovetov, together with the operational group of the Emergency Situations Ministry of Kazakhstan, visited the East Kazakhstan region. During the working trip, he held a meeting at the Emergency Situations Department and got acquainted with the current situation in the region. He gave a number of instructions regarding the readiness of civil defense services for the flood period, measures aimed at forecasting flood conditions, preventing floods, and paying special attention to the timely preparation of groups of forces and equipment in case of deterioration of the situation. In addition, the delegation, together with the leadership of the Emergency Situations Ministry and local executive bodies, visited settlements located in flood-prone areas of 2 cities and 11 districts. At the end of the 2024 flood period, local executive bodies, together with the Emergency Situations Ministry, corrected and clarified the list of settlements and districts at risk of flooding. In the region, 72 settlements with a risk of flooding have been identified, of which 15 have been eliminated, and 49 have been minimized. Last year, 107 anti-flood measures were carried out. Particular attention was paid to the construction of coastal protection dams. In accordance with the engineering work plan, more than 55 anti-flood measures were carried out in the region, 64 km of embankments were strengthened, 36 km of dams, embankments, shafts were repaired and built, 19 km of riverbeds were cleaned. In addition, 58 km of ditches and canals were built, 3 bridges were repaired, 45 culverts and structures were replaced, and 283 km of ditches and canals were cleaned. All these measures are aimed at reliable protection against flooding. "It is important to prevent it and protect settlements, taking all preventive measures, without waiting for an emergency," Alexey Sovetov noted. At the end of the working trip, he gave a number of instructions on the implementation of preventive measures to protect settlements in the region from possible flooding. Source : https://www.gov.kz/memleket/entities/emer/press/news/details/929066
The Ministry of Emergency Situations held a meeting of the Interdepartmental State Commission for the Prevention and Elimination of Emergency Situations 01.02.2025
A regular meeting of the Interdepartmental State Commission for the Prevention and Elimination of Emergency Situations was held at the Ministry of Emergency Situations under the chairmanship of Vice Minister of Emergency Situations Kegen Tursynbayev.The meeting was held in a videoconference format with the participation of representatives of central state bodies, deputy akims of regions, Astana, Almaty and Shymkent cities, as well as heads of territorial Emergency Situations Departments, heads and officials of the Ministry of Emergency Situations.During the meeting, the issues of the readiness of central and local executive bodies for the flood-prone period, the condition of supporting hydraulic structures and measures taken for their safe use, and the introduction of an urgent mass notification system (MassAlert) for the population via mobile devices throughout the republic were discussed.The Vice Ministers of Ecology and Natural Resources, Water Resources and Irrigation, Emergency Situations, Digital Development, Innovations and Aerospace Industry spoke on these issues. The deputy akims of a number of regions of the country were also heard."It is necessary to keep special control over the issues of ensuring the safety of hydrotechnical structures and the preparedness of the regions for floods. It is also necessary to ensure the implementation of a set of organizational and practical measures aimed at the full functioning of the MassAlert system in all regions of the country not only during earthquakes, but also during the threat or occurrence of all large-scale emergencies," concluded Vice Minister Kegen Tursynbayev.Following the results of the meeting, Vice Minister Kegen Tursynbayev instructed the interested state bodies and organizations to take measures to implement the proposed measures aimed at increasing the safety of the population and the preparedness of state bodies to prevent and eliminate flood phenomena. Source : https://www.gov.kz/memleket/entities/emer/press/news/details/928625
Deputies of the Senate Familiarized with the Work of the “Taskyn” Information System. 01.02.2025
Deputy of the Senate of the Republic of Kazakhstan Sergey Ershov visited the Strategic Planning and Operational Management Command Center of the Ministry of Emergency Situations and got acquainted with the progress of preparations for the flood period and the work of the Emergency Situations. Information system "Forecasting and Modeling of Floods". As part of the visit, Sergey Ershov attended a working meeting organized by the Ministry of Emergency Situations with the participation of representatives of the Ministry of Water Resources and Irrigation, Digital. Development, Innovations and Aerospace Industry, as well as "Kazhydromet". Opening the meeting, Vice Minister of Emergency Situations Batyrbek Abdishev introduced the deputy to the work of the updated control center and the Emergency Situations monitoring system. Then. , Specialists of the Ministry of Digital Development, Innovations and Aerospace Industry demonstrated the functionality of the information system for forecasting and modeling of floods "Taskyn", aimed at effective forecasting and flood risk management. The information system "Taskyn" is designed to automate forecasting processes. water entering the reservoir and the flow of spring rivers, as well as modeling of flood zones using the digital forecast of the hydrograph and planned water discharge from reservoirs. At the end of the visit, Sergey Ershov noted the importance of further improving information systems and made a number of proposals. increasing the effectiveness of preparatory work for the flood period.< br> Source : https://www.gov.kz/memleket/entities/emer/press/news/details/928818
A Seminar “Clean Kazakhstan — from a Green Kindergarten” Held Among Regional Kindergartens 01.02.2025
The meeting was attended by pupils and teachers from six preschool organizations who presented various projects related to ecology.The aim of the seminar was to identify environmental problems in the environment and ways to solve them, as well as to increase children's interest in local history.During the meeting, educators and children presented their projects on the topics "Little Ecologist", "Green Economy - Integrated Education", "Harms of Polyethylene Bags". In addition, an "Eco World" master class was held and a dialogue platform was organized called "What if you were the Minister of Nature Protection?".- The "Clean Kazakhstan" campaign is an important and widely supported initiative aimed at protecting the environment. Today, environmental education for children in preschool educational institutions is a socially significant direction in the educational process. It is of particular importance to familiarize a child with nature in preschool. After all, a person's health, intelligence and consciousness, attitude to labor and the external environment are formed up to the age of seven. Therefore, it is very useful to hold such events frequently. Such events have been continuing since last year. Last year, 27 regional, 208 city and district meetings were held in this direction for preschool organizations, - said the head of the regional education department Marat Abuov.Perizat Kalybekovna, a teacher-educator of the Nurshuak kindergarten in the Akkystau village of the Isatay district, teaches children how to properly sort garbage.— I teach children how to sort plastic, glass bottles, polyethylene bags and food waste into garbage cans through a game. Since they do not recognize letters, I use cards with pictures to show the method. Now I often hear from parents that children sort garbage when they go home and teach themselves how to do it, - says the mentor.It should be noted that this seminar was organized by the methodological center of the regional education department. More than 35 thousand children are brought up in 337 preschool organizations in the region. Among them, there are 151 state, 86 private and 100 centers.Source : https://www.gov.kz/memleket/entities/atyrau/press/news/details/928663
Traditional Fair Held 01.02.2025
Appropriate measures are being taken to maintain food prices in the Abay district. An agricultural fair was held in Karaul today.A kilogram of potatoes, carrots, cabbage, and onions was sold at 120 tenge at the fair, which is 2-3 times cheaper than the market price.In addition, it was possible to buy beef for 2200 tenge, an egg for 50, and 25 kilograms of feed (bran) for 1100 tenge.Borodulikha honey, various types of fish, dairy products, and chicken were also on display.Source : https://www.gov.kz/memleket/entities/abay/press/news/details/929250
Technological Park for Processing Livestock Products to Be Opened at Shakarim University 01.02.2025
Aigul Akhmedzhanova, Chairman of the Board of the National Agrarian Scientific and Educational Center, got acquainted with the work of Shakarim University. During the visit, the main issues of the development of agricultural science and education were discussed with the teaching staff.Another main goal of the meeting was to create a technopark aimed at processing livestock products in the future. The favorable climate and developed livestock infrastructure in the Abay region emphasize the relevance of these initiatives."The university has a rich history in training qualified specialists for the agricultural sector. We are confident that the creation of a technopark will significantly improve the quality and volume of local product processing," the head of the National Agrarian Scientific and Educational Center noted.The university leadership expressed its intention to deepen cooperation and intensify joint work on the development of the agricultural direction.Source : https://www.gov.kz/memleket/entities/moa/press/news/details/929108
DAY NUMBER 01.02.2025
The total area of rivers to be cleaned according to the Roadmap for 2025-2027 is814 kilometersSource : https://www.gov.kz/memleket/entities/water/press/news/details/929221
Water Dictionary. "Spread" 01.02.2025
Water DictionaryA floodplain is a section of land along a river that is flooded by floodwaters or melted snow. The land in the floodplains of rivers is very fertile. This is very important for livestock farming, as they are a natural fodder base.Source : https://www.gov.kz/memleket/entities/water/press/news/details/929226
Zhetysu region's economic growth last year 114.8% 01.02.2025
At the end of 2024, the economic growth in the Zhetysu region amounted to 114.8%, and the Head of State's task to ensure stable growth at the level of 6% was fulfilled. This was announced today at the akimat meeting chaired by the akim of the Zhetysu region Beibut Isabayev, the press service of the akim of the Zhetysu region reports.As stated at the meeting, the growth in the volume of gross regional product in the region is expected to be at the level of 9-10%. Growth in agriculture - 3.0%, in industry - 3.4%, housing commissioning - 15.2%, construction work increased by 1.5 times, and trade volume increased by 1.2 times. Revenues to the state budget exceeded 313 billion tenge, of which only local revenues amounted to 118 billion tenge.At the meeting, B. Isabayev drew attention to several topical issues.- The President identified 8 main areas at the expanded meeting of the Government. He noted that economic growth, especially the volume of private investment attracted, directly affects the quality of life of the population. In this regard, district and city akims should establish effective work with investors. They should learn to be not just executors, but also initiators, take responsibility, and work effectively. In order to improve the quality of life of the population, it is necessary to implement new investment projects and create jobs with decent salaries, - said B. Isabayev.In addition, he instructed to take measures to terminate contracts with unscrupulous contractors regarding "bearded construction" and complete construction facilities by the end of the year. At the same time, he emphasized that the targeted and timely development of the budget is the personal responsibility of district and city akims. Also, having listened to the reports of a number of regional department heads, Beibut Isabayev set them specific tasks regarding the development of industries. For example, it is necessary to introduce a permanent practice of reusing standard projects in construction. This method will allow reducing budget costs. He also instructed to improve the quality of education, promote the employment of college graduates, and attract highly qualified IT specialists to the region. As noted in the meeting, today the Regional Geoinformation System is operating in the region. This system allows for remote monitoring of sectors, including social, housing and communal services, emergency prevention, road, and agricultural sectors. - We finished the past year with good indicators. We are in second place in the republic in terms of fulfilling short-term indicators. The most important thing is to improve the quality of life of the population. This is also the requirement set by the President. Over the past two years, we have increased the level of gasification of the region from 29% to 56.5%. By the end of the year, this indicator should reach 72%. Special attention will be paid to drinking water supply and road repair. Special attention will be paid to the regional center, the city budget will increase by 33%. It is planned to create a city life management center in Taldykorgan according to the Smart City standard. Our goal is to turn the city into a safe, comfortable, beautiful, and green city. In general, a number of new changes have taken place this year. The concept of inclusive policy has been adopted. There are new introductions in financial and tax policy. We must fulfill the tasks set before us together with maslikhat deputies, veterans' organizations, and public associations, - said B. Isabayev.At the end of the meeting, the best were awarded based on the results of the year. In particular, the akimat of the Panfilov district was recognized as the "Best District" and was awarded a tractor. The "Zhetysu" TV channel was recognized as the best institution, and the channel was provided with new studio equipment. In turn, the construction department was recognized as the best department. In addition, the head of the regional economy and budget planning department Rauan Dautalinov, head of the culture, archives and documentation department Kuanysh Suleimenov, head of the land relations department Yermek Apekov, deputy akim of Taldykorgan Zhenis Andabekov, and chairman of the Eskeldy district maslikhat Kanat Satanov, who have effectively led in their respective fields, will be awarded a special badge of gratitude "For their faithful service and work." Press service of the akim of Zhetysu region. Photographer: Zhenis IskabaySource : https://www.gov.kz/memleket/entities/zhetysu-oblysy/press/news/details/929236
Those who smoked hookah in public places were punished in Astana 01.02.2025
Another night raid was conducted in the Esil district of the capital to prevent hookah smoking in public places, the official website of the Astana akimat reports.The preventive measure was organized by employees of the Astana district akimat together with the police department."Violations were registered in two entertainment establishments. In each of them, one case of illegal hookah smoking was identified, and administrative protocols were drawn up," said senior lieutenant of the police Zhuldyz Mikhin.Hookah smokers were fined under Article 441 of the Code of Criminal Procedure of the Republic of Kazakhstan.Such raids are regularly held in all districts of the city in order to prevent violations among residents and guests of the capital.It should be noted that the resolution on the introduction of a ban on hookah smoking in public places came into force on March 14, 2013. Violators of the law will be fined in the amount of 15 MCI. For repeated violations - 20 MCI. And the owners of the establishments will be fined from 20 to 60 MCI.Source : https://www.gov.kz/memleket/entities/astana/press/news/details/928673
Rehabilitation and development: what kind of assistance is provided to special children in the "Nurly Zhurek" center 01.02.2025
The Nurly Zhurek social service center, which provides specialized social services in the capital in a stationary and semi-stationary setting, has been operating for many years. The center provides assistance to children with severe somatic disorders, cerebral palsy, various forms of epilepsy, chromosomal diseases, autism, severe speech disorders and mental retardation, as reported by the official website of the capital's akimat.Those in the institution's care are divided into groups according to age, gender, and characteristics of mental and physical development. The institution provides 8 specialized social services: household, medical, educational, psychological, labor, cultural, legal and economic.The center has a specialized room for children with autism spectrum disorders, a sensory room, a Montessori room, sewing, wood and metalworking workshops, a library, SBO rooms, computer rooms, game labyrinth complexes, exercise therapy rooms, physiotherapy, and a halotherapy (salt mine) equipped with modern technical equipment.The territories of the buildings are equipped with modern outdoor sports equipment and anti-vandal game complexes, football, basketball and volleyball courts.Students of the center actively participate in city, republican and international events such as Spesial Olympics, "Zhuldyz-ay", "Arman asulary". Over the past 10 years, it has won 115 gold, 90 silver and 95 bronze medals in various types of Olympic sports.Source : https://www.gov.kz/memleket/entities/astana/press/news/details/928671
Anti-flood work underway in Astana 01.02.2025
Akim of Astana Zhenis Kasymbek wrote on his Instagram page about the progress of flood prevention work, the official website of the capital's akimat reports."We continue active work against floods in the city. Public utilities have removed more than 4.5 million cubic meters of snow.Currently, since the beginning of the year, 11.5 thousand linear meters of the ditch-trough network have been cleaned, 8,640 linear meters of collectors, 428 monitoring and rain-receiving wells have been washed, several pumping equipment at stations has been replaced, etc.Also, reconstruction of the Yesil River bed (water-regulating dam, stage 5) has been carried out; work is underway to identify illegal connections to storm sewer systems, raids are being carried out in private housing sectors, etc.All of the above work is ongoing. Civil defense agencies, public utilities, etc. are on constant alert. "Special attention will be paid to settlements and areas at risk of flooding, cleaning water supply structures, and constructing storm sewer systems," Zhenis Kasymbek wrote.Source : https://www.gov.kz/memleket/entities/astana/press/news/details/929196
Regional akim Marat Akhmetzhanov met with the head of the Orthodox Church in the Republic of Kazakhstan, Metropolitan of Astana and Kazakhstan Alexander 01.02.2025
During the meeting, Marat Akhmetzhanov expressed his condolences to Metropolitan Alexander on the tragic death of Archbishop Serapion, who headed the Kokshetau and Akmola diocese.“Vladyka Serapion made a great contribution to strengthening interfaith harmony in our region. Having served in the diocese for more than 10 years, he earned the respect and trust of not only parishioners and clergy, but also residents of the region and leaders of other faiths,” the regional akim noted.In turn, the head of the Orthodox Church in the Republic of Kazakhstan thanked the regional akim for his support and sympathy in difficult times. Metropolitan Alexander noted that Archbishop Serapion was an outstanding spiritual mentor who devoted his life to serving people and strengthening the spiritual foundations of society.In addition, during the meeting, the parties discussed issues of interfaith harmony, spiritual and moral education of youth, and joint social initiatives aimed at the benefit of the region. Source : https://www.gov.kz/memleket/entities/aqmola/press/news/details/929093