Technology
In 2025, Almaty will complete the modernization of the solid waste collection infrastructure 06.12.2024
Within the framework of the republican concept of "Taza Kazakhstan" in Almaty, it is planned to completely modernize the infrastructure for the collection of solid household waste by the end of 2025. This was announced by Mayor Yerbolat Dosayev during a session of the city maslikhat, which reviewed the draft budget of the megalopolis for 2025-2027.The large-scale project has been implemented since 2023 due to the high wear and tear of the solid waste collection infrastructure created in 2012. The main goal is to improve the environmental situation, increase the comfort of citizens and comply with modern standards of sanitary cleaning.The Mayor of the city stressed that comprehensive measures will significantly improve the quality of services provided. So, today, the daily output of garbage trucks on the line has increased from 70% in 2023 to 85% in 2024, and in 2025 it will be increased to 95%.Currently, 8,003 containers are operating in Almaty, located at 1,454 container sites. As part of the modernization, the number of buried containers with a volume of 3 cubic meters has been increased, which prevent the spread of unpleasant odors and the access of birds or stray animals. In 2023, 214 containers were installed at 42 sites, for which 600 million tenge was allocated. In 2024, the number of such containers was increased by 786 units at 142 sites, for which 1.3 billion tenge was allocated. In 2025, another 1,683 containers will be installed at 581 sites, which will require investments in the amount of 4.3 billion tenge.In addition, 1,800 plastic Euro containers with a volume of 1.1 cubic meters were purchased in 2024, and another 1,000 such containers are planned to be purchased in 2025. Thus, in 2025, the share of modernized container sites will reach 100%.These measures will not only improve the efficiency of waste collection, but also create conditions for further implementation of the principles of separate garbage collection and recycling. The city continues to demonstrate its commitment to sustainable development initiatives and improving the quality of life of the population.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/897739
Everyone is responsible: certification of facilities continues in Almaty 06.12.2024
Akim of Almaty Yerbolat Dosayev, during an extraordinary session of the maslikhat, at which the draft three-year budget of the city is being considered, spoke about the implementation of landscaping passports. These documents are provided for by the new City Improvement Rules adopted this year."Within the framework of the Taza Kazakhstan program initiated by the Head of State, the Akimat is taking systematic measures to improve and green our beloved city. Landscaping and landscaping of the city is our priority to create a comfortable urban environment and improve the quality of life of Almaty residents. To achieve a new quality of landscaping and expand the green fund, financing of these important priorities will increase by 40%, or 50 billion tenge, to 170.5 billion tenge in 2025," Yerbolat Dosayev said.The head of the city recalled that in July of this year, the Rules for the improvement of the city were approved, providing for the introduction of passports for the improvement of territories. Certification allows you to clearly define the boundaries of responsibility of entrepreneurs and other entities for adjacent territories.The landscaping passport describes the procedure for maintaining the territories of residential housing, construction, children's and sports grounds, storm sewer networks, garden furniture and MAFas. The owners of buildings and structures are obliged to ensure their proper maintenance and operation, including timely repair and painting of facades. In addition, the administrative responsibility of owners for improper aesthetic and sanitary condition of facades and territories is fixed.The certification process is divided into three stages. At the first stage, more than a thousand objects on main streets, in urban areas and on pedestrian spaces were covered. At the second stage, attention is paid to streets of regional significance, and the final stage will cover streets of local significance and courtyard territories.This document has already been issued for about 2 thousand business entities, and by April 1, 2025, the complete completion of certification with coverage of 6,039 objects will be gradually ensured.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/897756
Systematic measures for landscaping and landscaping are being taken in Almaty - Yerbolat Dosayev 06.12.2024
This was announced by the mayor of the city, Yerbolat Dosayev, during a session of the maslikhat, at which the budget of the metropolis for 2025-2027 was considered."In order to achieve a new quality of landscaping and expand the green fund, financing of these important priorities will increase by 40%, or 50 billion tenge, to 170.5 billion tenge in 2025," Mayor of Almaty Yerbolat Dosayev said in his speech.To ensure a comfortable urban environment, new Landscaping Rules have been adopted, three-year contracts for complex maintenance of courtyards have been introduced, and approaches to repairing facades of houses along main streets have been revised.Since January 2024, three-year contracts for the maintenance of yards have been concluded for the first time. They cover sanitary cleaning, repair of landscaping elements and maintenance of green areas. This approach eliminates the blurring of contractors' responsibilities and increases work efficiency. 141 units of equipment were purchased for the Almaty Tazalyk Park in 2023-2024, and 32 more units of equipment are planned to be purchased in 2025. The work of Almaty Tazalyk in 2025 will focus on cleaning main streets.As part of the comprehensive work on the development of urban infrastructure in Almaty, new approaches to landscaping are being actively introduced on behalf of the mayor of the city, Yerbolat Dosayev. In 2023-2024, more than 643 thousand green spaces were planted, and by 2030, according to the approved Roadmap, 2.5 million trees and shrubs are planned to be planted.One of the key areas for improving the state of the green fund was the introduction of drip irrigation and automatic irrigation systems. In 2023, 500 thousand trees were covered (200 km of drip irrigation), in 2024 another 110 km was added for 220 thousand trees. In 2025, it is planned to install 120 km of drip irrigation and 168 km of automatic irrigation, which will provide care for 240 thousand trees.Starting in 2025, it is planned to start mass planting of large-sized seedlings: 23 thousand trees over 4 meters high and 4 thousand trees over 6 meters high.In addition, the city will use three-tiered landscaping, including lawns and flower beds (first tier), shrubs and ornamental plants (second tier), as well as large-sized trees (third tier). This will significantly increase the green canopy and create a cozy environment for the townspeople.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/897626
Yerbolat Dosayev: Three-year contracts for complex maintenance of yards have been introduced in Almaty 06.12.2024
A new principle for the sanitary maintenance of courtyards and the road network has been introduced in Almaty. Mayor of the city Yerbolat Dosayev announced this at an extraordinary session of the city maslikhat, during which the budget of the metropolis for 2025-2027 was considered."For the first time, the Akimat has introduced the practice of concluding three-year contracts for the integrated maintenance of courtyards, which include sanitary cleaning, repair of landscaping elements and maintenance of green areas. To service 4,020 courtyards and 24 million square meters of the street and road network, the 2025 budget provides 27 billion tenge with an increase of 10% compared to 2024," Yerbolat Dosayev said.It should be noted that earlier contests for the maintenance of courtyards and streets were held once a year, and it was unprofitable for contractors to purchase expensive special equipment. This was due to concerns that they might not win the tender next year, which would make such investments unjustified.In this regard, on behalf of the Mayor of Almaty, Yerbolat Dosayev, in order to improve the quality and efficiency of cleaning work in the city, competitions have been held since this year with the conclusion of three-year contracts with the condition of annual indexation of financing.This measure will create a more predictable and sustainable working environment for the development of contractors. In addition, the innovation will avoid downtime in cleaning due to the absence of contractors during the competitive procedures. In turn, contractors will be able to plan expenses for the purchase of equipment and the expansion of staff.Today, sanitary cleaning in Almaty covers 24 million square meters. m of territory; 2,318 streets with a length of 2,777 km; 1,304 km of sidewalks and 1,167 km of irrigation ditches. There are also 4,020 yards cleaned daily in eight districts of the city.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/897633
Yerbolat Dosayev: Almaty returns the status of a garden city 06.12.2024
As part of the execution of the instruction of the Head of State on the revival of Almaty as a garden city, the active implementation of the program for large-scale landscaping of the metropolis continues. This was announced by Mayor of Almaty Yerbolat Dosayev during a session of the city maslikhat, which considers the draft budget of the megalopolis for 2025-2027.One of the key initiatives is the Green Almaty Roadmap, approved in 2022. The main goal of the program is to plant 2.5 million green spaces by 2030. It is planned to plant 320 thousand trees and shrubs annually. Over 1.2 million trees will be planted by 2025, and about 1.3 million trees by 2030.In 2024, out of 320 thousand green spaces, 224 thousand seedlings have already been planted, of which more than 150 thousand are trees, and 74 thousand are shrubs. Tree planting continues, 96 thousand more seedlings are to be planted by the end of this year."In order to implement the instructions of the Head of State on the revival of the status of "Almaty – garden city", 500 km of automatic irrigation and drip irrigation networks were installed in 2023-2024, in 2025 another 290 km of such networks will be installed in the amount of 4.1 billion tenge. This will allow covering more than 1 million trees with an automatic irrigation system," Yerbolat Dosayev said.Recall that in April 2024, as part of the "Almaty is our common Home" campaign, a large–scale landscaping campaign "Almaty is a garden city" was held. During the event, more than 7 thousand green spaces were planted, including 4,015 fruit trees (3,855 apple trees), 1,090 deciduous trees and 2,600 shrubs.The main plantings were carried out in key areas of the city: 2,270 apple saplings in the ALA Park, 500 fruit trees in the park north of BAKA Street (apple tree — 250 pcs., apricot — 250 pcs.) and 1,000 hardwood trees on the observation deck along the Boraldai River.The regional akimats have also actively joined in the creation of apple alleys and the planting of shrubs. 70 apple trees and 250 shrubs were planted in the Alatau district, 220 apple trees in the Medeu district, of which 150 seedlings were planted on the territory of the Almaty Zoo, 230 apple trees in the Bostandyk district, including 150 seedlings in the park of the First President.The Green Almaty Roadmap is not only a contribution to improving the environmental situation, but also to improving the quality of life of citizens. Green spaces contribute to improving the microclimate, reducing air pollution and creating a comfortable urban environment.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/897639
In Almaty, in 2025, the budget for landscaping and landscaping of the city will increase by 40% compared to this year 06.12.2024
Almaty will increase the financing of expenses for landscaping and landscaping of the city. This was announced by the mayor of the megalopolis Yerbolat Dosayev during the session of the city maslikhat, which considers the city's budget for 2025-2027."Within the framework of the Taza Kazakstan program initiated by the Head of State, the Akimat is taking systematic measures to improve and green our beloved city. These are our main priorities for creating a comfortable urban environment and improving the quality of life of Almaty residents," Yerbolat Dosayev said.Thus, financing of expenses for landscaping and landscaping of the city will increase by 40% from 121.6 billion tenge in 2024 to 170.5 billion tenge in 2025.Also, the successful implementation of the program "Budget of public participation" continues in Almaty. Over the past three years, 938 projects worth 39.1 billion tenge have been implemented, including 18.8 billion tenge in 2024. For 2025, the budget provides for 17.1 billion tenge.As Yerbolat Dosayev noted during his speech, the program "Budget of People's Participation" has become an effective tool for implementing the ideas and wishes of citizens, and the Akimat of Almaty intends to support its development.It should be noted that according to the proposals of Almaty residents, yard territories, children's and sports grounds were landscaped, new public spaces, pedestrian zones were created, and outdoor lighting lines were drawn.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/897645
The national climate report on the greenhouse gas inventory was discussed 06.12.2024
On December 5, 2024, Zhasyl Damu JSC hosted a seminar on the main issues and provisions of national climate reporting in the format of the national report of the Republic of Kazakhstan on the inventory of anthropogenic emissions from sources and sinks of greenhouse gases not regulated by the Montreal Protocol 1990-2022.In the modern era, the problem of climate change is becoming a global crisis. Resolving the issue is becoming an indispensable part of the strategy for achieving the Sustainable Development Goals, the main focus of which is aimed at improving human well-being and the security of our planet.According to the results of the UN report on achieving the Sustainable Development Goals in 2023, Kazakhstan took 66th place among 166 countries, scoring 71.6 points out of 100. This marks an improvement over the previous year (2022 – 71.1 points).In addition, the Biannual Transparency Report developed by Zhasyl Damu JSC turned out to be the best. The main part of BTR1 is the National Inventory Report on Anthropogenic Emissions from Sources and Removals by sinks of Greenhouse Gases.The opening of this seminar was attended by Vice Minister of Ecology and Natural Resources of the Republic of Kazakhstan Mansur Oshurbayev, expert on climate policy of UNDP in Kazakhstan Gulmira Sergazina, as well as the management of JSC Zhasyl Damu. The moderator of the seminar is Ayman Yessekina, Director of the Greenhouse Gas Inventory Department of Zhasyl Damu JSC.This seminar was organized following the presentation of the First Biennial Transparency Report of the Republic of Kazakhstan (BTR1) to the UNFCCC Secretariat, developed by the United Nations Development Program in Kazakhstan and JSC Zhasyl Damu within the framework of the project "The First biennial Report and the joint Ninth National Communication and the Second Biennial Transparency Report of the Republic of Kazakhstan within the framework of the UN Framework Convention on Climate Change."BTR1 contains mandatory information on the national greenhouse gas inventory and progress in the implementation of the ONUV (nationally determined contribution). The preparation of information on the national inventory of greenhouse gases is carried out by JSC Zhasyl Damu, which is the operator of the carbon trading system of the Republic of Kazakhstan.For reference: Emissions that contribute to the effects of greenhouse gases are ozone with a water vapor content of 36-72, carbon dioxide 9-26, methane 4-9 and percent 3-7. Some greenhouse emissions resulting from natural processes include ozone, nitric oxide, methane, carbon dioxide and water vapor. After the addition of anthropogenic additives, the throughput is exceeded and the natural balance is disrupted, so that global warming and climate change occur.The seminar discussed calculations of greenhouse gas emissions in economic sectors: the energy sector, which includes the oil and gas industry and transport; industrial processes and product use; agriculture; forestry, other land uses and the waste sector. Source : https://www.gov.kz/memleket/entities/ecogeo/press/news/details/897583
Large-scale planting of large-sized trees will begin in Almaty in 2025 05.12.2024
In 2025, large–scale planting of three-tiered landscaping will begin on the territory of Almaty, where the first tier will consist of a lawn and flower beds, the second tier will consist of shrubs and ornamental plants, and the third will consist of large-sized trees.The relevant draft budget for 2025-2027 is planned to be considered at the upcoming session of the Maslikhat of Almaty. This was reported by the press service of the city Maslikhat.In total, it is planned to plant about 17 thousand large-sized trees, of which 15 thousand will be more than 4 meters high, and 2 thousand - more than 6 meters.Planting will be carried out on public lands: along main streets, in parks, squares, boulevards and other public spaces. This approach will make it possible to create shade and green areas in the shortest possible time, which is especially important for densely populated areas of the city.The project provides for the use of modern methods of planting and caring for trees. Within two years after planting, systematic care of the plantings will be organized, including drip irrigation and installation of automatic irrigation systems, as well as fertilizing trees and shrubs with mineral fertilizers adapted to local conditions, which will accelerate their survival.Landscaping is aimed at improving the environmental situation and improving the quality of the urban environment. Planting large-sized trees will reduce the time for the formation of a full-fledged green infrastructure and create comfortable conditions for residents.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/897127
According to preliminary information, 10.6 billion tenge is planned to be allocated in Almaty for landscaping and environmental projects in 2025 05.12.2024
In 2025, Almaty plans to allocate 10.6 billion tenge for environmental projects, which is aimed at improving the quality of life of citizens and developing a comfortable urban environment. The relevant draft budget for 2025-2027 is planned to be considered at the upcoming session of the Maslikhat of Almaty. This was reported by the press service of the city Maslikhat.Among the main directions are the greening of the city, improvement of infrastructure for the collection of solid household waste and landscaping of natural objects.The greening project of the city includes the continuation of the planting of trees and shrubs, as well as the improvement of parks and green areas. This year, 170 thousand seedlings are planned to be planted in Almaty at the expense of budgetary funds, of which more than 110 thousand have already been planted since the beginning of the autumn planting season. This will help to increase the area of green spaces per citizen from 12.5 to 12.8 sq. m.In addition, the solid waste collection system will continue to be updated in 2025. More than 2 thousand deep-type container platforms will be built in the city, which will improve the sanitary condition of the city. In addition, a project is being developed for a new landfill for solid waste disposal in the Ili district, which will help effectively solve waste disposal issues in the future.Projects for the reconstruction of riverbeds such as Ulken Almaty and Kargaly, as well as the improvement of the Sairan reservoir, are aimed at restoring natural ecosystems and creating new environmentally friendly recreation areas for citizens.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/897129
Improvement of the sanitary condition of Almaty: construction of new container sites and replacement of old garbage containers 05.12.2024
As part of comprehensive measures to improve the sanitary condition and aesthetics of Almaty in 2025, it is planned to build 581 new container sites and install 1,683 containers of the buried type.The relevant draft budget for 2025-2027 is planned to be considered at the upcoming session of the Maslikhat of Almaty. This was reported by the press service of the city Maslikhat.Modern containers will help to optimize the use of space, reduce the occupied area, prevent the appearance of unpleasant odors and provide reliable protection from birds and stray animals. Today, 786 such containers have already been installed in the city, which is an important step in creating a cleaner and more comfortable urban space for residents.In addition, in 2024, 1800 plastic euro containers with a volume of 1 m3 were purchased in Almaty for the collection of solid household waste. These containers will be transferred to garbage collection organizations, which will improve waste disposal processes.Recall that in 2012, 197 deep-type container sites were built in Almaty and 1,001 containers were installed. However, over 10 years of operation in an aggressive environment, these containers have undergone significant corrosion. For further operation of containers in Almaty, new products are purchased from a domestic manufacturer, which uses primary food-grade environmentally friendly polyethylene of high quality.These materials comply with international standards, and the production technology allows us to produce containers with a uniform thickness throughout the product, without seams and internal stresses, which significantly increases the reliability, strength and durability of containers.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/897138
In 2025, it is planned to improve the Bauma grove in Almaty 05.12.2024
In 2025, Almaty plans to implement a project to improve the Bauma grove, which is one of the main natural sites of the city. The area of the grove is 137.7 hectares, it is located in the Turksib district between Seifullin and Suyunbai Avenues. The relevant draft budget for 2025-2027 is planned to be considered at the upcoming session of the Maslikhat of Almaty. This was reported by the press service of the city Maslikhat. The purpose of the project is the revival of the grove as an ecologically significant territory, popularization of eco-awareness among residents. The peculiarity of the approach is the minimal interference with the natural component of the grove. Small architectural forms will appear on the territory: benches, gazebos, urns, as well as equipment for children's games and sports. During landscaping, the natural relief and soil cover will be preserved in order to avoid erosion and minimize the amount of excavation work. The Baum Grove will be divided into three zones:• The active zone will be located around the perimeter of the grove to provide access to the infrastructure for outdoor activities.• The recreation area will become a place for a relaxing holiday with minimal infrastructure.• The ecozone will be designed for the conservation and restoration of natural flora and fauna with limited intervention. The whole project is based on three key principles: restoration, eco-zoning and safety. The implementation of landscaping is aimed at making the grove a modern, environmentally friendly and comfortable recreation area for citizens.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/897147
Violation of the Almaty landscaping passport: businessmen were fined 500 thousand tenge 05.12.2024
Deputy Akim of Almaty Beibut Shakhanov checked the work of public utilities in cleaning streets and courtyards in preparation for the winter season.During the detour, comprehensive cleaning works were inspected on main streets, in courtyards, as well as on the territories of commercial facilities.As a result, 7 commercial organizations for improper cleaning: two Degirmen cafes, Starbucks, Sultan Cafe, Bay and Nanduk, Kimex store, responsible for cleaning the territory around their buildings, were fined 140 MCI, totaling 516,880 tenge.In addition, an administrative protocol was drawn up against the contractor with a fine of 20 MCI for an untidy yard in the Medeu district.It is worth noting that within the framework of the Cleanliness Week, employees of the State Enterprise "Almaty Tazalyk" are working in an enhanced mode, preparing the city for the winter period. In particular, the collection and removal of fallen leaves and debris, cleaning of irrigation ditches, as well as landscaping of courtyards are being completed.Sanitary cleaning covers 2,318 streets with a total area of 25.1 million square meters. m and a length of 2,777 km. 841 units of equipment and 1,400 road workers will be involved in the effective performance of work for the winter period. In addition, the fleet of the State Enterprise "Almaty Tazalyk" was replenished with 32 new modern cars.Recall that since this year, Almaty entrepreneurs have been issued landscaping passports. According to the document, they must keep order in their territories within the framework of the Taza Kazakhstan program. The landscaping passport specifies the requirements for landscaping and sanitary cleaning, provision of urns and maintenance of small architectural forms. In case of violations of the requirements, entrepreneurs are administratively liable in accordance with Article 505 of the Code of Administrative Offences of the Republic of Kazakhstan.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/897160
Сенат одобрил поправки в бюджет на 2024-2026 годы 05.12.2024
Заместитель Премьер-Министра – министр национальной экономики Нурлан Байбазаров презентовал в Сенате уточненный прогноз параметров республиканского бюджета и Национального фонда на 2024 год в рамках Прогноза социально-экономического развития страны на 2024-2028 годы.Как сообщил Нурлан Байбазаров, с начала года исходные параметры формирования прогноза макропоказателей на 2024 год укладываются в текущее развитие экономики страны.«По итогам 11 месяцев текущего года средняя цена на нефть сложилась на уровне $79,9 за баррель. Исходные параметры на 2024 год сохранены на прежнем уровне: цена на нефть – $80 за баррель. Инфляция сохранена в коридоре 6-8%», - проинформировал вице-премьер. Доходы республиканского бюджета оцениваются в объеме 14,1 трлн тенге, что на 2 трлн тенге ниже утвержденного плана. Учтено дополнительное привлечение целевого трансферта в объеме 2 трлн тенге для обеспечения сбалансированности бюджета и поддержания уровня регионального роста.С учетом этого, чистые валютные активы Национального фонда по прогнозам в 2024 году составят $58,2 млрд.Source : https://www.gov.kz/memleket/entities/economy/press/news/details/896902
It is planned to allocate money in Almaty for the construction of innovative creativity centers and an innovative college 05.12.2024
By the four centers of innovative creativity opened this year in Almaty, two more will be built. The corresponding draft of the three-year budget is planned to be considered at the upcoming session of the Maslikhat of Almaty. This was reported by the press service of the city Maslikhat.This year, 4 centers of innovative creativity and inclusive education have already been opened in Almaty, which allow developing the potential of young residents of the city. As a result, Almaty schoolchildren received 64 gold medals at national and 20 at international Olympiads.Work in this direction will continue in 2025. Thus, the construction of the center for development and creativity in the Bostandyk district on Vakhtangov Street will continue and the construction of the Center for Development and Creativity in the MKR will begin. "Sayaly" of the Alatau district.In addition, the construction of an innovative technical college in the MKR will continue next year. Algabas, as well as the construction of an extension to the building of the Humanitarian Pedagogical College No. 2 and the College of Telecommunications and Mechanical Engineering with a dormitory.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/896683
Road safety and video monitoring: Almaty will finance the development of digital projects 05.12.2024
In 2025, 16.3 billion tenge is planned to be allocated in Almaty for the development of digital projects.The relevant draft budget for 2025-2027 is planned to be considered at the upcoming session of the Maslikhat of Almaty. This was reported by the press service of the city Maslikhat.It is planned that in 2025, funds from the new budget will be allocated for the maintenance of 6 thousand video cameras in places of mass gathering of citizens and agro-industrial complex "Sergek", thanks to the work of which the number of accidents in the metropolis decreased by 17% and the number of deaths in accidents by 40%. Currently, there are 1,641 such complexes operating in the city. In just 9 months of this year, more than 3 million violations were recorded in Almaty, of which over 18.7 billion tenge was collected from the city budget.Also, the implementation of the project "Unified Video Monitoring System" continues in the megalopolis. As of today, 45,2 thousand video cameras are connected to the system in 616 public and 240 private facilities. Next year, their number will grow to 70 thousand. The main goal of the project is to introduce a single platform for combining all city surveillance cameras. This will allow you to analyze video streams in real time and use them for various tasks. Artificial intelligence algorithms allow you to detect clusters of people and analyze their behavior, identify fights, suspicious objects, search for people and vehicles, recognize fire and smoke.In the future, new types of video analytics are planned to be launched next year, aimed at solving the tasks of public utilities and urban services, such as identifying garbage disposal areas, filling garbage containers, determining the level of flooding of public spaces and streets, detecting stray animals and much more.It should be noted that according to the project "Video monitoring system in crowded places", 6 thousand cameras will be installed by the end of this year.In addition, part of the funds from the budget is provided for the further development of the Situational Center of the city, which allows you to track the status of all activity in the city online.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/896690
The three-year budget of Almaty includes financing for the continuation of the reconstruction of schools with seismic reinforcement 05.12.2024
In Almaty, work on the reconstruction and modernization of schools with seismic reinforcement will continue next year. The relevant draft budget for 2025-2027 is planned to be considered at the upcoming session of the Maslikhat of Almaty. This was reported by the press service of the city Maslikhat.According to the draft budget for the next three years, almost 250 billion tenge is planned to be allocated for the maintenance of 216 schools, 12 boarding schools, 20 colleges with a total coverage of 344 thousand students.Reconstruction and modernization of schools with seismic reinforcement is one of the main priorities of the city akimat. With the adoption of the new three-year budget, the modernization of educational institutions in the metropolis will continue in compliance with high quality standards.Thus, as part of the fulfillment of the instructions of the Head of State to ensure seismic safety, seismic reinforcement of 3 schools will be completed in 2025, work will begin on seismic reinforcement of lyceum school No. 50, seven nursery gardens in Auezovsky, Bostandyk and Medeu districts. In addition, the construction of 2 schools (Zerdeli and Shugila districts) and the reconstruction of 12 schools will be completed next year. In 2023-2024, major repairs with seismic reinforcement were completed in 11 schools of the city.Along with this, 14 schools for 24.2 thousand places will be introduced in the megalopolis next year as part of the national project "Comfortable School". By the next academic year, the shortage of student places will decrease to a "manageable" level – 3-4 thousand places.Thanks to the measures taken in Almaty, the gradual transition of schools to single-shift education continues. By the next academic year, 43 schools out of more than 200 public schools will switch to single-shift education (an increase from 12.5% to 18.4%).Much attention is paid to the modernization and development of the infrastructure of urban schools. This year, 168 classrooms of a new modification were purchased for them in 89 schools. This allowed 86.3% of schools to be equipped with modern classrooms.At the same time, in 2025, it is planned to allocate funds for the continuation of the construction and reconstruction of 5 kindergartens in the MKR. Orbita-3, Altyn-Besik, Kuramys, Shugyla and mkr. No. 10. This will also be done as part of the implementation of the instruction of the Head of State – to cover 97% of children aged 3 to 6 years with preschool education by 2025.It is also planned to build 3 kindergartens in the MKR next year. Karagaily, Darkhan and Nurkent. Thus, after the completion of construction works, access to preschool institutions for 2,280 children will be provided, which will significantly improve the quality of education and early development in the metropolis.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/896696
Almaty plans to improve the embankment of the Bolshaya Almatinka River 05.12.2024
In 2025, the improvement of the embankment of the Bolshaya Almatinka River with a length of 5.7 km on an area of 23.4 hectares will begin in Almaty.The relevant draft budget for 2025-2027 is planned to be considered at the upcoming session of the Maslikhat of Almaty. This was reported by the press service of the city Maslikhat.The project includes the reconstruction of concrete retaining structures, the construction of pedestrian and bike paths, the installation of bridges, lighting poles, CCTV cameras, playgrounds and sports grounds, recreation areas and modular public toilets. Landscaping of the territory and the creation of viewing platforms are also provided.By the way, in 2024, Almaty completed the creation of a green zone along the Boraldai River in the Alatau district on an area of 24 hectares. A pedestrian bridge, a skatepark, playgrounds and sports grounds have already been equipped there, benches, urns and modular toilets have been installed. The experience of such projects shows that well-maintained embankments and green areas are becoming a popular recreation area and improve the quality of the urban environment.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/896706
Almaty plans to finance the purchase of another 100 school buses in 2025 05.12.2024
The relevant draft budget for 2025-2027 is planned to be considered at the upcoming session of the Maslikhat of Almaty. This was reported by the press service of the city Maslikhat.Recall that the Almaty project "School Bus" was launched for the first time in Kazakhstan in 2023 on behalf of Akim of Almaty Yerbolat Dosayev.As part of the second stage of the project, 100 buses have been additionally purchased this year for transporting schoolchildren. Thus, now 200 buses transport more than 9 thousand children to 51 schools. Next year, as part of the continuation of the project, it is planned to purchase another 100 buses.Buses will go on routes as applications are received from schools where children living in remote and hard-to-reach areas study. This is one of the priorities according to which school buses are allocated. Detailed itinerary sheets have been developed for each school to ensure the transportation of students.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/896591
Punching Saina Street will reduce the traffic load from Momyshuly Street by 40% 05.12.2024
In the near future, the draft three-year budget of the megalopolis will be considered at a meeting of the Maslikhat of Almaty. The press service of the Maslikhat of the city reported on which infrastructure projects funds are expected to be allocated. So, in 2025, it is planned to complete the construction of a transport interchange at the intersection of Ave. Seifullina - Zhansugurova St. and the breakthroughs of Sain Street from Ryskulov Ave. to Akyn Sara St., as well as Abai Avenue to the city border.In July next year, the punching of Sain Street from Ryskulov Avenue to Akyn Sara Street with a total length of 3.2 km will be completed. Due to this, it is expected to reduce the traffic load by 40% from Momyshuly Street. Also in May, the punching of Abai Avenue from B. Momyshuly Street to the city border will be put into operation. The total length of the punching will be 5.3 km with a six-lane road, bike paths and sidewalks on both sides. In June, it is planned to fully complete the construction with landscaping of the adjacent territory of the transport interchange at the intersection of Zhansugurova Street and Seifullin Avenue. The project involves the construction of 2 tunnels with a total length of 690 meters to ensure uninterrupted traffic along Seifullin Avenue. The passage of vehicles along Zhansugurova Street will be carried out at ground level. There are also 4 aboveground pedestrian crossings, sidewalks and landscaping. As of today, the asphalt concrete pavement of all exits has been installed, one aboveground pedestrian crossing has been erected, and work is underway to rebuild sewer and contact networks. In addition, work has been completed on the installation of asphalt concrete pavement for the Zapadny and Vostochny tunnels along Seifullin Avenue. It should be noted that after the interchange is put into operation, it is expected that the capacity along Zhansugurova Street will increase by 15%, along pr. Seifullina - by 20%.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/896602
In Almaty, contractors will be fined for poor cleaning of courtyards and streets 04.12.2024
During the Cleanliness Week, within the framework of the "Taza Kazakhstan" concept, the city held a mass cleaning of streets and public spaces in order to prepare for the winter season. Special attention is paid to the yard territories.As you know, starting from January 1, 2023, on behalf of Akim of Almaty Yerbolat Dosayev, intra-house territories are being cleaned at the expense of the akimats of the districts. Before that, there was a problem of poor-quality work of KSK janitors, which residents constantly complained about. The akimat of the district did not have the funds for this work. In addition, a legal vacuum was formed when intra-house territories remained practically unattended when creating associations of property owners and simple partnerships.Today, the situation has changed for the better. Now contractors responsible for the cleanliness of streets, parks and courtyards are strictly responsible for improper performance of their duties. As Mayor of Bostandyk district Sanjar Alin noted, a feedback system is used to control the quality of cleaning through the chairmen of the AXIS and KSK, as well as with residents of the district through messengers."If contractors do not fulfill their obligations, we respond promptly. First, we fine the head of the site, then the organization itself. If the situation does not improve, we terminate the contract through the court. There is already a contractor to whom a pre–trial letter has been sent," the mayor of the district said.In general, in the Bostandyk district, cleaning of territories is carried out on a systematic basis. Thus, Stamp Service LLP carries out cleaning and maintenance of 4 parks, 13 squares, 9 boulevards, dividing strips, public areas, embankments of the Bolshaya Almatinka and Yesentai rivers and transport interchanges with a total area of 309.7 hectares. Also, the contractor's forces are cleaning the ditch networks with a length of 13.4 km.KGP "Almaty Tazalyk" is cleaning within the territory of the roadway area of 6 interchanges, 263 streets and driveways with a total length of 272.9 km. In addition, mechanized and manual cleaning of sidewalks with a length of 180.9 km and an area of 456,678 sq. m. is carried out. Cleaning and maintenance of irrigation ditches on 115 streets of the district with a length of 164.1 km. 7 units of special equipment and 28 road workers are involved in cleaning the irrigation system.Eurasiyakazinvest LLP maintains 7 aboveground and 12 underground pedestrian crossings. Such contractors of the district as ABS-LD Stroy LLP, Avan Kurylys LLP, Almaty Dormechanization LLP, Senim Group Construction LLP are engaged in the maintenance of courtyards. Sanitary cleaning of 670 courtyard territories is carried out on a daily basis.At the same time, according to the deputy head of the Almaty Municipal Infrastructure Development Department, Zhanat Zhakupbek, the daily output of equipment for street cleaning during the daytime is about 600 units and 800 road workers, 220 units of equipment and up to 250 road workers during the night shift. By the forces of 9 contractors, in addition to the State Enterprise "Almaty Tazalyk", sanitary cleaning is carried out from 2318 streets with a total length of over 2.7 thousand km. For the winter period, 841 units of equipment have been prepared for the maintenance of territories, 1,400 road workers will be involved in clearing roads and sidewalks.Source : https://www.gov.kz/memleket/entities/almaty/press/news/details/895988