Politics
For the first time in zaisan district, a drip irrigation system was introduced on an area of about 500 hectares 16.11.2024
For the first time in Zaisan District of East Kazakhstan region, a drip irrigation system was introduced on an area of about 500 hectares. This was announced by the director of the Kazsushar branch in East Kazakhstan region Nurzhan Amirzhanov during a meeting with journalists.In the region, 2.8 thousand hectares of land are irrigated by water-saving systems. This year, an enterprise for the production of sprinkler irrigation equipment was opened in Ust-Kamenogorsk. The first samples of the company's products were installed on 185 hectares of Ulansky district. By the end of the year, it is planned to install water-saving systems on more than 400 hectares of arable land.It should be recalled that the Ministry of Water Resources and irrigation, together with the Ministry of Agriculture, increased the amount of subsidies for the installation of water saving systems from 50% to 80%. Thus, by the end of 2030, the ministry intends to cover more than 50% of the total area of irrigated land in the Republic with water-saving technologies and save up to 2.2 cubic kilometers of water per year."In the East Kazakhstan region, the irrigation period was successful, which made it possible to collect a good harvest. The branch provided 36.7 million cubic meters of water to farmers for irrigation of 9.2 thousand hectares. As part of the preparation for the vegetation, the canal with a total length of 18 kilometers was cleaned mechanically, work was carried out on the repair of hydrobenches and their certification"- said Nurzhan Amirzhanov, director of the Kazsushar branch in the East Kazakhstan region.Source : https://www.gov.kz/memleket/entities/water/press/news/details/876416
Last week's News review of the Ministry of Water Resources and irrigation 16.11.2024
28.10.AstanaKazakhstan and France explore the Ili-Balkhash Basin. Nurzhan Nurzhigitov met with Ambassador Extraordinary and Plenipotentiary of France to Kazakhstan Silvan Giogh and discussed the directions of bilateral cooperation.Important: the Ministry is preparing to sign a memorandum of cooperation and a trilateral agreement with the French Development Agency (AFD) and the French Geological and Mining Research Bureau (BRGM). In addition, it is considering the possibility of cooperation with the International Water Bureau (OiEau).29.10.AstanaKazakhstan and Spain are ready to cooperate in the construction of water infrastructure and training of specialists. Nurzhan Nurzhigitov met with representatives of the Spanish Association of Industrial Engineers, which unites more than 1000 construction companies in Spain.As a result: according to representatives of the Association of industrial engineers, Spanish construction companies intend to work on water management facilities in Kazakhstan. In addition, they expressed their readiness to provide support for professional development of industry specialists.01.11.AstanaKazakhstan and China are negotiating on the distribution of water in transboundary rivers. Nurzhan Nurzhigitov met with Ambassador Extraordinary and Plenipotentiary of the people's Republic of China to Kazakhstan Zhang Xiao.Topical: one of the priorities in the negotiations is the issue of water distribution in transboundary rivers. For this purpose, a special Working Group has been formed, which includes experts from both sides. The main goal is the sustainable water supply of the Ili-Balkhash Basin, the development of Fisheries and tourism.28.10.AstanaIn honor of the Republic Day, the first meeting of the Public Council of the Ministry of Water Resources and irrigation was held. Since its inception, the public council has given an expert assessment of 13 regulatory legal acts developed by the Ministry of Water Resources and irrigation.30.10.AstanaThe country's reservoirs are preparing for the flood period. To date, reservoirs in the south are operating in a catchment mode for the next year's irrigation season. Water is supplied from the warehouses of the northern, western and eastern regions. This is done in order to provide free tanks for receiving melt snow water during spring floods.31.10.ZHETYSU REGIONMore than 200 km of canals have been cleared in Zhetysu region. In addition, 22 hydraulic structures and 21 hydrometric stations were repaired.01.11.East Kazakhstan regionFor the first time in Zaisan District of East Kazakhstan region, a drip irrigation system was introduced on an area of about 500 hectares. In the region, 2.8 thousand hectares of land are irrigated by water-saving systems.Recall: the Ministry of Water Resources and irrigation, together with the Ministry of Agriculture, increased the amount of subsidies for the installation of water saving systems from 50% to 80%. Thus, by the end of 2030, the ministry intends to cover more than 50% of the total amount of irrigated land in the Republic with water-saving technologies and save up to 2.2 cubic kilometers of water per year.Source : https://www.gov.kz/memleket/entities/water/press/news/details/876418
About 17 billion cubic meters of water were sent to the Caspian Sea 16.11.2024
Since the beginning of the year, 16.7 billion cubic meters of water have been sent to the Caspian Sea through the Ural River.More, the average perennial flow of the Ural River9.46 cubic kilometers. But this year the volume of water exceeded the average annual norm.It is worth noting that the flow of the river is formed depending on the volume of water sent from the Iriklin reservoir in Russia."Since the beginning of the year, representatives of the Ministry have held 28 meetings with colleagues from Russia, China and Central Asian countries on transboundary rivers. Negotiations on the regulation of water volumes during the flood period will be held in an enhanced mode," said Moldir Abdualiyeva, official representative of the Ministry of Water Resources and irrigation.Source : https://www.gov.kz/memleket/entities/water/press/news/details/876433
Ministry of Agriculture: empty capacity of elevators for storage of grain from New crops amounted to 7.6 mln tons 16.11.2024
To date, with an average yield of 16 c/ha, 26.6 million tons of grain and legumes have been threshed.The total capacity of grain storage facilities in the Republic is 30 million tons, which fully meets the needs for storing grain for the current year.The utilization rate of licensed grain storage facilities is 42% with a free volume of 7.6 million tons. In the main grain regions, free power indicators are also at a stable level:Kostanay region: 1.6 million tons of free volume;North Kazakhstan region: 1.8 million tons of free volume;Akmola region: 2.5 million tons of free volume.The ministry continues to actively work to ensure uninterrupted grain intake and storage.As part of the instructions given at the operational headquarters under the chairmanship of deputy prime minister S. M. Zhumangarin, work is underway to put into operation previously unused elevators."In North Kazakhstan region," "ashchykol elevator" "LLP with a capacity of 74.6 thousand tons was launched, in Kostanay region- ""Olzha Denisovskoye 1 "" LLP with a capacity of 173 thousand tons." Grain acceptance is currently underway.The current storage capacity is sufficient to effectively manage harvesting and storage. The operation of elevators is under constant control.If you have any questions about grain storage or the operation of elevators, You should contact the Department of Agriculture:Kostanay region:- deputy akim of the region Abenov Arman +7 (7142) 575-010- Head of the Department of Agriculture Bekmukhamedov Ibrahim +7 (7142) 54-27-95North Kazakhstan region:- deputy akim of the region Marat Tasmaganbetov +7 (7152) 46-46-84- Head of the Department of Agriculture Tokuzhinov Dauren +7 (7152) 53-36-20Akmola region:- deputy akim of the region Balpan Murat +7 (7162) 29-72-80- Head of the Department of Agriculture Alimzhanov Kenesh + 7 (7162) 72-28-00.Source : https://www.gov.kz/memleket/entities/moa/press/news/details/876339
Residents of Zhibek Zholy village of Akmola rgn got access to natural gas 16.11.2024
Akmola region continues to implement important infrastructure projects aimed at improving the quality of life of the population and supporting the region's economy. As part of the implementation of the address of the head of state on gasification of settlements, residents of Zhibek Zholy village of Arshalinsky district received access to natural gas.Gasification of a large settlement will allow more than 2,000 yards to be connected to the gas supply system by the end of this year, and the total coverage will be about 6,000 homeowners. The length of the gas pipeline in the village of Zhibek Zholy is about 250 kilometers.The launch ceremony was held with the participation of Akim of the region Marat Akhmetzhanov, chairman of the Board of JSC "NC"QazaqGaz" Sanzhar Zharkeshov and deputies of the Mazhilis of the Parliament of the Republic of Kazakhstan."The main task set by President Kassym-Jomart Tokayev is to increase the standard of living of the population. Today we have provided the villagers with natural gas.This is one of the most important areas of our work. This year, 12 projects for gasification of settlements with coverage of 125 thousand people are being implemented in the region," the governor of the region noted."Gas connection is not only an improvement in living conditions for the population, but also an important step towards sustainable development of settlements. The National Company QazaqGaz is constantly working to ensure energy security and improve the quality of life in different regions of the country," Sanzhar Zharkeshov said.One of the first connected subscribers was the Orazov family."This is a very happy and long-awaited event for our family. Our 5 grandchildren live with us, and we try to make their lives more comfortable," said the head of the family Esirkepbay Orazov.In addition, one-time social assistance is provided in Arshaly district to cover the costs of connecting and installing gas equipment to socially vulnerable categories of citizens. The amount of assistance is up to 100 MCI (369,200 tenge), depending on the actual costs. Owners of Housing registered and permanently residing in the territory of arshalinsky district can receive these funds.For the convenience of citizens, a service center has been opened in the village akimat, where residents can receive all the necessary assistance for gas connection, housing registration and social assistance. In addition, registration measures are carried out here to update data on the population and accurately calculate gasification costs.It should be noted that in 2022, 16 settlements located along the main gas pipeline route were gasified in the region. 8.9 billion tenge was allocated for the implementation of the project. In the future, it is planned to gasify the Tselinograd district. Source : https://www.gov.kz/memleket/entities/aqmola/press/news/details/876140
Head of region inspected construction of infrastructure facilities in Semey 16.11.2024
Akim of the region Nurlan Urankhaev visited a number of facilities in Semey and checked the progress of construction.Now a block-modular point is being built in the Karagaily microdistrict. This facility is designed to improve the Heat Supply System of one of the dynamically developing areas of the city. Now work continues on the installation of boilers, air ducts and sewers at the construction site. Work on laying the foundation of the chimney and coal storage facility is also being completed.The head of the region also got acquainted with the construction of a school for 1200 seats, which is being built within the framework of the National Project "comfortable school". The construction is planned to be completed by December 2024. As part of the national project, advanced technologies and modern approaches to construction are being used."The implementation of these projects will not only improve the quality of life of Semey residents, but also increase the comfort and safety of the city. We must fulfill our duty to the residents and complete the construction on time. Therefore, the pace of work should not slow down. Winter is under pressure, " the governor of the region said to the contractors.In connection with the work on the construction site, the mayor instructed his deputy Dimitri Garikov and the heads of departments not to relax supervision.Source : https://www.gov.kz/memleket/entities/abay/press/news/details/876133
Kazakhstan and China hold talks on water distribution in transboundary rivers 16.11.2024
Minister of Water Resources and irrigation Nurzhan Nurzhigitov met with Ambassador Extraordinary and Plenipotentiary of China to Kazakhstan Zhang Xiao. The parties discussed topical issues of bilateral water cooperation. One of the priorities in the negotiations is the issue of water distribution in transboundary rivers. For this purpose, a special Working Group has been created, which includes experts from both sides. The main goal is the sustainable water supply of the Ili-Balkhash Basin, the development of Fisheries and tourism. The Ministry of Water Resources and irrigation of the Republic of Kazakhstan intends to sign a memorandum of cooperation with the Ministry of water management of the PRC in the future.In addition, the parties discussed issues of joint modernization and automation of Kazakhstan's water infrastructure, development and implementation of water saving technologies, as well as professional development of Kazakhstani specialists in China."We have reached an agreement with Power China to conduct advanced training courses for Kazakhstani specialists in China. I think that the initiatives discussed today will give a new impetus to the bilateral relations between Kazakhstan and China, Minister of Water Resources and irrigation Nurzhan Nurzhigitov said." In turn, Mr. Zhang Xiao noted that the Chinese side attaches great importance to water cooperation with Kazakhstan and intends to continue the exchange of experience and technologies.Source : https://www.gov.kz/memleket/entities/water/press/news/details/875660
In September-October 2024, more than 2.2 million tons of Kazakh grain were shipped 16.11.2024
In September-October 2024, the volume of grain movement in the domestic market and for export reached a good level. More than 2.2 million tons of grain were processed, which is 40% higher than in the same period last year. Barley exports are developing especially rapidly, reaching 150 thousand tons to the Iranian market alone.After the end of the harvesting campaign and clarification of the volume of the final harvest, there is a significant revival in the grain market.Promotion of Kazakhstan's agricultural products on international markets is one of the priorities of JSC NC "Food Contract Corporation".In this direction, work is underway to intensify cooperation with foreign investors and search for promising markets. Thus, the Food Contract Corporation has stepped up its work to expand the geography of exports of Kazakhstani products, going beyond the traditional market.In addition, the export shipment consolidation program is the main link in this. The program provides for free export, uniting a batch of farmers without the purchase of grain from farmers, without full transport support. Currency income goes directly to the peasant.To date, with the participation of the Food Contract Corporation, importers from Uzbekistan, Kyrgyzstan and China have signed export contracts for the supply of agricultural products from Kazakhstani farmers for a total amount of 19.5 million US dollars.It is planned to expand the positive experience of concluding a pilot contract.In this regard, the state provides comprehensive assistance to export operations of agricultural producers.Source : https://www.gov.kz/memleket/entities/moa/press/news/details/876147
International Hand-to-Hand Combat Tournament 16.11.2024
From November 1 to November 3, 2024, as part of patriotic education and promotion of physical culture, an international hand-to-hand combat tournament was held dedicated to the memory of an outstanding athlete and world champion, police Major Ruslan Mukanov.This event brought together 14 teams from different regions and created an atmosphere of unity and healthy rivalry. The athletes showed high training and fighting spirit, which allowed them to compete for prizes.According to the results of the competition, the places were distributed as follows:Almaty region is the first place;BATYR TEAM – second place;ABYROY TEAM is the third place.The teams demonstrated outstanding results, but special attention was drawn to the athletes of the BATYR TEAM, who showed high results in personal weight categories:Madimuhamed Ernar - 1st place in the category up to 62 kg;Yaroslav Rezmeritsa - 2nd place in the category up to 62 kg;Anas Nurkesh - 1st place in the category up to 80 kg.Congratulations to the athletes of the Ministry of Emergency Situations who have achieved high results!Source : https://www.gov.kz/memleket/entities/emer/press/news/details/876203
Acceptance of applications for the project "Budget of national participation" started in the Baikonur district 16.11.2024
In the capital's Baikonur district, the acceptance of applications for landscaping within the framework of the project "Budget of national participation" has begun. All residents of the district who have reached the age of majority can send their proposals, the official website of the Akimat of Astana reports.The aim of the project is to improve the area on the initiative and suggestions of residents.Proposals can be sent to the official Internet resource of the Akimat of the Baikonur district WWW.BAIKONYR-ASTANA .KZ in the section "Budget of popular participation 2025". To send a proposal, you need to fill out an application (specify the name of the project, its description), attach a sketch and an estimate (may be approximate), photos of the current state, optionally attach a presentation. The same section contains the Rules of this project, a standard project proposal, the timing of project activities, and the composition of the Expert Council.Based on the decision of the Expert Council, the office of the akim of the Baikonur district begins to implement project proposals. The results of the decision of the Expert Council and the implementation of the project will be published on the Internet resource of the Akimat.If the project proposal is supported by other residents during the voting process, it will be recommended for implementation this year at the expense of the city budget.Applications are accepted until March 1, 2025.For additional questions within the framework of the project "Budget of national participation", you can find out by the contact number: +7 701 553 2627 , head of the landscaping department Rakhat Kenzhetaev.It should be recalled that 170 courtyards and public spaces will be landscaped in Astana this year. The works cover all areas of the city, including residential areas. Most of the work has already been completed.Source : https://www.gov.kz/memleket/entities/astana/press/news/details/876124
Cooperation on agriculture issues was discussed by the Deputy heads of Government of Kazakhstan and Russia 16.11.2024
Deputy Prime Minister of the Republic of Kazakhstan Serik Zhumangarin and Deputy Prime Minister of the Russian Federation Alexey Overchuk held talks on cooperation in agriculture. They were a continuation of the discussions raised at the meeting of the Intergovernmental Commission on Cooperation between the two countries.The parties noted the general readiness of information systems for the exchange of electronic veterinary accompanying data in the field of plant quarantine. Now there is a stage of interstate testing of the Kazakh IP by the EEC. After successful completion of these procedures and integration of Kazakh and Russian information systems, participants will be able to have online access to a single database of permits for the import, export and transit of controlled goods, as well as to the register of organizations and persons engaged in the production, processing and storage of agricultural products. This will significantly simplify and accelerate the transportation of export-import operations for plant and livestock products.The Kazakh side informed about its readiness to lift restrictions on the import and transit of pork through Kazakhstan from 16 more regions of the Russian Federation in the near future. The safety of these regions has been confirmed by the results of relevant studies and the expiration of the required time periods. Recall that this year, restrictions on the import and transit of pork from the territory of 43 regions of the Russian Federation were lifted in stages, starting in January. The meeting participants also discussed the situation regarding the Rosselkhoznadzor's restrictions on the import of certain types of agricultural products from Kazakhstan to Russia. The parties exchanged proposals on the possibilities of an early settlement and lifting of these restrictions, which will be considered in detail by specialists of the sectoral departments of the two countries. Following the meeting, the parties agreed to hold another meeting to summarize the results of the negotiations.Source : https://www.gov.kz/memleket/entities/moa/press/news/details/876142
Akim of the region met with residents of the Energetik microdistrict 16.11.2024
Akim of the region Abai Nurlan Urankhaev met with residents of the Energetik microdistrict. During the meeting, he listened to the requests of the residents and answered the questions asked.The Energetik microdistrict is one of the new microdistricts in the regional center. In recent years, the number of apartment buildings has increased here, and the population is also growing. Roads are paved in the neighborhood, heating is supplied stably. Nevertheless, there are issues of concern to residents."I have been living in this area for several years now. We invited a lot of managers to tell them about our problems, no one came before you. We see the large-scale work that is being carried out in the city, and we are glad about it. Thank you and your team for this. Now we would like attention to be paid to our district," said Gulmira Sadykkyzy, a resident.Among the issues raised by residents were landscaping, hot water, and the arrangement of a playground. They also mentioned that sometimes cold water is turned off."Every issue that you have raised will not be ignored. But you need to understand that the problems that have been accumulating for many years will not be solved in one day. We will gradually eliminate them. There are more than 500 yards in the city. We restored some of them last year, and this year we also improved many courtyards. The work will continue, and your neighborhood is also included in the plan. I will personally control all these works," the governor of the region said.The governor of the region not only met with residents, but also inspected the neighborhood to familiarize himself with the situation personally. At the end of the trip, he gave specific instructions to his deputy Dimitri Garikov and other responsible persons to solve the problems of the neighborhood.Source : https://www.gov.kz/memleket/entities/abay/press/news/details/876130
In the Zhetisu region, a cultural center with a library will be built in the village of Kopbirlik at the request of residents 16.11.2024
A new house of culture with a library will be built in the village of Kopbirlik in the Zhetisu region. This became known today during a meeting of the akim of the region Beibit Isabayev with the residents of the village, held near the recently introduced new sports and recreation complex. Taking into account the requests of residents, the head of the region instructed the relevant responsible persons to begin preparatory work for the construction of an important social facility, the press service of the akim of the Zhetisu region reports.During the meeting, residents of Kopbirlik village noted that the road to the village has been repaired, and the quality of drinking water has improved. In turn, Beibit Isabayev stressed that work to improve the quality of life of the population will continue:- Kopbirlik is one of the most remote villages in the region. As part of the execution of the instructions of the President of the country, we pay attention to the improvement and development of not only the settlements closest to the regional center, but also remote villages. To improve the quality of life of the population, first of all, high-quality drinking water, roads, light and social facilities are needed. People should feel the improvement not in words, but in deeds. We made a road leading to your village, solved the problem with water quality. A new sports and recreation complex and a rural akimat have been built. Now, taking into account your requests, we will build a cultural center with a library. An equally important issue is the creation of a fire station for two rural districts, equipped with everything necessary. We will also continue work on repairing streets and stopping lighting, - said the head of the region B. Isabayev.In turn, expressing gratitude for the support provided, the villagers voiced their requests and suggestions.- For many years, you are the first akim of the region who specially came to us, to our remote village. This suggests that our problems are not ignored. For example, we have built a modern sports and recreation complex. We are still happy, young people are engaged in sports, which means that the health of the nation is being strengthened. There are sections on judo, table tennis, togyzkumalak, volleyball, basketball. Our children are happy to visit. I believe that new champions will come out of here who will glorify our country. Now our request is to build a workout area on the territory of the sports complex, especially since there is a free space behind the building," said villager Nurlan Berdakhmetov.But another villager noted the need to allocate a minibus to transport rural children to various kinds of competitions.Having supported the proposals voiced by the villagers, the akim of the region gave appropriate instructions to the akim of the district and responsible persons.The participants of the meeting also discussed the problem of the condition of the 2.5 km long road to Lake Balkhash. As the villagers noted, it is especially difficult to get to the coast during the rainy season. Beibit Isabayev, noting that it is necessary to provide a gravel surface, said that the necessary financial support will be provided.By the way, on the same day, as part of a working visit to the Karatal district, akim of the region Beibit Isabayev visited the rural akimat in the village of Kopbirlik, got acquainted with the progress of the overhaul of block B of the district polyclinic, and also visited the newly opened military enlistment office of a new type in Ushtobe. Also in the village of Eskeldy, the head of the region inspected the progress of the construction of block-modular FOCA and a house of culture.The press service of the akim of the Zhetisu region Photographer: Zhenis YskabaiSource : https://www.gov.kz/memleket/entities/zhetysu-oblysy/press/news/details/876043
KGIR-2024: Aktobe delegation held a meeting with investors 16.11.2024
The Kazakhstan Round Table on Global Investments (KGIR-2024) was held in the capital of Kazakhstan, which brought together more than 500 delegates from various countries, including representatives of international companies and experts.The event, headed by Prime Minister of Kazakhstan Olzhas Bektenov, discussed key investment trends and their impact on international strategies.Special attention was paid to the issues of industrial development of the regions. Within the framework of KGIR-2024, a Memorandum of Cooperation was signed between the Akimat of Aktobe region and MKS Vostok LLP for the implementation of a project to build a plant for the production of technical methanol in Aktobe region. The new project will allow the development of local methanol production, which will contribute to import substitution and strengthen the economic potential of the region.Also during the event, the Prime Minister of Kazakhstan presented awards to the best investors for their significant contribution to the development of the regional economy. In particular, the company "Zerde Ceramics" LLP was noted for its contribution to the construction industry of the Aktobe region.Within the framework of KGIR-2024, Deputy Akim of Aktobe region Abdikarimov A.A. held a number of meetings with business representatives from the USA, Spain, Iran, as well as with Kazakhstani and international manufacturers in the fields of electrical engineering, construction industry, automotive industry, etc. These negotiations are aimed at strengthening business ties and promoting further economic development of the region.KGIR-2024 has become a unique platform for sharing experiences and discussing new opportunities for growth and investment cooperation.Source : https://www.gov.kz/memleket/entities/aktobe/press/news/details/876055
A road that has not been repaired for almost 30 years has been put in order in the Zhetisu region 16.11.2024
The road to the remote village of Kopbirlik has been repaired in the Zhetisu region. The results of the work done were inspected today by akim of the region Beibit Isabayev during a working trip to the Karatal district, having traveled all sections of the Ushtobe – Almaly – Kopbirlik road covered by repairs, the press service of the akim of the Zhetisu region reports.The total length of the Ushtobe – Almaly – Kopbirlik road is 176 km, repairs were carried out on the order of 137 km, of which 78.5 km – this year. The rest of the road is in good and satisfactory condition.In particular, from the village of Kopbirlik to the village of Almaly in 2021, an average repair of a section of this road with a length of 28 km was carried out. The rest of the road construction was divided into four sections.- Last year, a section from 5 km to 35 km with a total length of 30 km was repaired. As of today, asphalt laying works have also been completed on 90-147 km of the highway, where 40 km of the site was repaired. Landscaping is underway at this stage. In particular, the strengthening of the curb, the installation of signs. This section will be introduced by November 10. Repair work has been completed on both the second and third sections of the highway. These facilities have been put into operation. Thus, asphalt has been laid on all the specified sections of the Ushtobe–Almaly –Kopbirlik road. The total cost of the project is over 4.9 billion tenge. The road of the III category, the width of the carriageway is 7 meters," head of the regional department of passenger transport and highways Galymzhan Daribayev reported to the head of the region.After listening to the speaker, Beibit Isabayev, noting the quality of the repair, expressed gratitude to the contractor for the timely completion of an important facility.- At one of the meetings with the population, local residents raised the problem of the condition of the road to the village of Kopbirlik. In this regard, we have taken measures to bring the road into line. As of today, the repair is fully completed. Considering that heavy freight transport does not travel so much in this direction, the road will serve for about 10 years, it is made qualitatively. Kopbirlik is one of the most remote villages in the region. First, they made a road, solved the problem with the quality of drinking water. In general, there are concrete plans for the further development of remote and border villages," the head of the region noted.Local residents also shared their opinion.- I am from the village of Baishegir myself. The road has not been properly repaired for almost 30 years. Now the residents of Kopbirlik are here, and we are very happy. The repair was really carried out very efficiently. And it has become convenient for us motorists in general. Now, in 1.5 hours, we slowly get to our district center – the city of Ushtobe," said local resident Tutintai Musapirov.By the way, next year the reconstruction of the bridge near the village of Almaly on 145 km of the Ushtobe – Almaly – Kopbirlik road will be carried out. In general, by the end of the year, the level of roads of regional significance in good and satisfactory condition in the Zhetisu region will be 94%.The press service of the akim of the Zhetisu region Photographer: Zhenis YskabaiSource : https://www.gov.kz/memleket/entities/zhetysu-oblysy/press/news/details/876022
The problem of drinking water quality has been solved in the remote village of Kopbirlik in the Zhetisu region 16.11.2024
Residents of the most remote village of Karatal district, Kopbirlik village, have access to high–quality drinking water. Although the village has a centralized water supply system, in recent years residents have had to drink salt water. Akim of the region Beibit Isabayev got acquainted with the results of the measures taken to solve the problematic issue today, visiting Karatal district as part of a working trip, the press service of the akim of the region Zhetisu reports.Recall that in 2010, the reconstruction of the water supply system was carried out in the village, including the construction of new networks, a well with a depth of more than 100 meters was also dug, and a desalination plant was installed. Despite the measures taken in recent years, the salinity level of water has increased from 5.9 to 8 grams per liter, which caused concern to the population.In this regard, on behalf of the akim of the region, Beibit Isabayev, funds were allocated from the budget, and the necessary measures were taken to solve the problem. In particular, 2 km of networks were reconstructed, valves were replaced, a new water tower was installed and an upgraded higher-capacity desalination plant was installed, which is capable of desalinating water even if the salinity level reaches 12 grams per liter.As part of a working trip to the village of Kopbirlik, the governor of the region personally inspected the water quality, and also met with local residents.- Drinking water is the key to health, so its quality plays the most important role. The quality of drinking water in our village has been poor for the last few years. Thanks to your support, this year this long-standing problem has been solved. The population is pretty. I think that our village will continue to receive the necessary attention," said a resident of the village of Zamzagul Nesipbaeva.By the way, the number of households in Kopbirlik village is 179, of which 168 subscribers are connected to the central water supply. The total population of the village exceeds 900 people.The press service of the akim of the Zhetisu region Photographer: Zhenis YskabaiSource : https://www.gov.kz/memleket/entities/zhetysu-oblysy/press/news/details/876033
New cultural center, outpatient clinic and sports complex will be built in Almaly village 16.11.2024
Three new socially significant facilities will be built at once in Almaly village of Karatal district. In particular, it is planned to build a house of culture, a medical outpatient clinic and a sports complex. Today, this was announced at a meeting with residents of the village of Almaly by Akim of the Zhetisu region Beibit Isabayev, who visited the Karatal district as part of a working trip, the press service of the akim of the Zhetisu region reports.There are 1,200 people living in the Baishegir rural district, and over 800 residents in the village of Almaly itself. The old house of culture in the village has not been used since 2000, as it fell into disrepair. As a result, the dilapidated building was demolished, and construction of a new cultural center began this year. In the near future, the villagers will have their own comfortable place for holding cultural events and organizing useful leisure activities for children and youth. According to the governor of the region, talking with residents, the construction of the house of culture is scheduled to be completed next summer.Also, a new outpatient clinic for 50 visits per shift will appear next to the hospital in the village of Almaly. Currently, the results of the competition have been summed up, and the contractor has been identified.- The building of our rural hospital was built in the 80s, only current repairs were carried out. Considering that the building is morally and physically outdated, it is very gratifying that they decided to build a modern outpatient clinic next to it, equipped with everything necessary. Now the old hospital building will be used as an inpatient hospital, and the outpatient clinic will act as a rural polyclinic. In total, we have 14 medical workers," said Makpal Sultan, head of the Almala Rural Hospital.Continuing the conversation with the villagers, Beibit Isabayev noted that next year the reconstruction of the bridge near the village of Almaly on 145 km of the Ushtobe –Almaly – Kopbirlik road will be carried out. - There is a school and a hospital in your village, now we will build a modern outpatient clinic and a cultural center. That year, a new ambulance was transferred to Kopbirlik village, and this year to Almaly village. We will repair internal roads and pay attention to street lighting. Taking into account your requests, it was decided to build a sports complex according to a standard project in accordance with the number of people. In general, first of all, we are taking measures to improve rural infrastructure, and at the second stage we are paying attention to the construction of social facilities. Now it is necessary to develop small and medium-sized businesses and agriculture locally. State support is also provided in this direction, including within the framework of the Auyl Amanaty program. The population needs to take advantage of the opportunities provided, - summed up the head of the region B. Isabayev.The press service of the akim of the Zhetisu region Photographer: Zhenis YskabaiSource : https://www.gov.kz/memleket/entities/zhetysu-oblysy/press/news/details/876037
Young leaders of Kazakhstan met with deputies of the Maslikhat of Astana to discuss social initiatives 16.11.2024
Deputies of the Maslikhat of Astana met with participants of the Republican Children's Kurultai of leaders of student self-government "Time to act" to discuss social initiatives, the official website of the capital's akimat reports.The event brought together about 20 presidents of school parliaments from the regions of the Republic of Kazakhstan and deputies of the capital's maslikhat. At the opening ceremony, the acting chairman of the Maslikhat of Astana, Askar Smagulov, made a welcoming speech."Today we have gathered to discuss the issues that concern young people and the school community. My colleagues will tell you about the activities of the maslikhat and share their experience with you. I am sure that each of you faces various problems and challenges in your school, finds unique ways to solve them, introduces new ideas, organizes events and projects that help make school life more interesting and meaningful. Your efforts are already bearing fruit, but it is important to understand that this is only the beginning of the path," he said.Askar Smagulov also stressed that such meetings contribute to a better understanding of issues relevant to young people and help to learn about the decision-making system at the city level."Dear participants, I urge you to actively use this time: share your projects, experiences, do not be afraid to ask questions, discuss topics of concern to you. Let this meeting be an opportunity for you to find new friends and like-minded people, to see that you are not alone in your aspirations, that there are other guys who want and are ready to make the world a better place. And we, in turn, will do everything possible to promote the implementation of your ideas, to help you achieve success in your endeavors," concluded Askar Smagulov.As the organizers of the event noted, the main purpose of the meeting is to strengthen ties between youth and representatives of the maslikhat, as well as create conditions for the active participation of children and adolescents in social initiatives. Source : https://www.gov.kz/memleket/entities/astana/press/news/details/875938
The contest "Taza Kazakhstan - Taza Astana" is held among media representatives in the capital 16.11.2024
Astana Tazalyk LLP is holding a competition among media representatives of Taza Kazakhstan - Taza Astana, the official website of the capital's akimat reports.The task of the competition is to tell about ensuring the sanitary condition of Astana, its outskirts and settlements, garbage collection and disposal (manual and mechanized cleaning of streets, roads, squares, sidewalks, driveways and other public areas); conducting flood control measures (pumping water from flooded areas with mobile pumping units; snow removal from residential areas to snow landfill); formation, development, achievements and prospects of the Astana Tazalyk service within the framework of the state environmental program "Taza Kazakhstan".Representatives of the Kazakh media, authors and bloggers are invited to participate in the competition.The competition is held in the following categories:1) "The best TV material";2) "The best Social media post";3) "The best article in a printed publication";4) "The best publication in an online publication".Works in the state or Russian languages published in the period from October 7 to December 10, 2024 are accepted for participation in the competition. The number of works offered for the competition is unlimited.The work will be evaluated by an independent commission, which will include experts and specialists in the field of municipal services of the city and reputable journalists. The jury will be guided by the following criteria:1) relevance and relevance to a given topic;2) the depth of disclosure of the topic and the reliability of the information provided;3) presentation style;4) the originality of the author's judgment.Materials for participation in the competition are accepted by e-mail: astana_tazalyk@mail.ru . Contact phone number: +7 778 700 4324 .The works are accepted until December 10, 2024 at 18:00 Astana time.The results of the competition will be announced on December 11-13, 2024.The prize fund is 3 million tenge.Source : https://www.gov.kz/memleket/entities/astana/press/news/details/875946
Prevention and prevention: measures to combat drug crime among young people were discussed in Astana 16.11.2024
A meeting of maslikhat deputies with the leaders of student self-government was held in Astana. Chairman of the standing committee of the Maslikhat of the city on law and order and public relations Azamat Aitkhozhin told the audience about the fight against drug crimes, the official website of the capital's akimat reports.According to the deputy, more and more young people are getting involved in drug trafficking."Ignorance and lack of knowledge about the law do not exempt from responsibility. You have probably heard about cases when students of our schools were involved in drug trafficking and received long sentences for it — up to 10 years in prison," he addressed the youth.According to him, it is necessary to increase the effectiveness of the fight against drug trafficking and change prevention methods."We must convey to young people that drug use leads to personal degradation and serious health problems. Drug addiction not only threatens human health, but also poses a danger to others, as it can lead to immoral and aggressive behavior," he said.In conclusion, Azamat Aitkhozhin advised young people to spend their leisure time usefully, develop, and gain new knowledge."In each district you can find sports grounds and places for art classes. Your task is to take advantage of all these advantages," he concluded.Source : https://www.gov.kz/memleket/entities/astana/press/news/details/876039